How Long Did The McNamara Terminal Take To Build?  
User currently offline7E72004 From United States of America, joined Mar 2004, 3587 posts, RR: 2
Posted (9 years 9 months 1 week 4 days 4 hours ago) and read 4815 times:

How long did it take for them to build the new terminal at DTW? I guess i am curious from the time that "sketches" were being drawn up to the opening. I am just trying to get an idea of if the IND terminal will open when they are saying it will. I know both terminals are different but in general terms is what i was thinking. thanks  Smile


The next generation of aircraft is just around the corner!
3 replies: All unread, jump to last
 
User currently offlinePSU.DTW.SCE From United States of America, joined Jan 2002, 7565 posts, RR: 28
Reply 1, posted (9 years 9 months 1 week 4 days 3 hours ago) and read 4795 times:

The midfield terminal at DTW had been in the works for a long time.

The initial concept came to light in the late 80's/early 90's when DTW was looking at its long-term master plan. Pretty much after the NW/RC merger already then, DTW was max-ed out spacewise in its current form.

The south access road, new tower, and new crash rescue building were the first elements included in the plan and opened in 1992. The south access road was built in preparation for the new terminal and to connect to the current facilities. However, until 2002, the road basically went nowhere and ended in the middle of the airfield at the new tower. In 2000/2001 they began extending it up to the north to connect with Rogell Drive.

NW and Wayne County announced the new terminal formally in 1996. I believe site preparation began in 1998 or so. Actual construction in terms on concrete pouring and steel work started in 1999. The shell of the building was completed in late 2000 I believe. I remember that the steel work went up real fast. At the same time the parking deck was being built from prefab concrete sections, and the roadway was being extended to the north. Runway 4L/22R construction was also concurrent with the midfield terminal, with site work beginning in 1998.

The terminal was to open in December 2001 but was pushed back until late Feb. 2002 due to minor construction delays and also NW wanting to wait until after the holidays to minimize the impact of transitioning facilities and wait until slower demand. The new runway opened in Dec. 2001. I remember being in the new terminal three days after it opened at it was still a work in progress. There were still contractors everywhere, a lot of construction equipment, especially out in B/C. But either way, it was a great improvement and is generally well received. The improvements currently underway will only make it better in the future.

Perhaps someone else will have better dates. I'm sure that IND's terminal will be nowhere near the scale of the Worldgateay. (Note - I won't call it the McNamara terminal because the corrupt old dude doesn't deserve to have his name on the facility, but thats a whole other story) Plans were in the works for a while until formally announced, but site prep took about a year and actual construction was about 3 years +/-.


User currently offlineNWAFA From United States of America, joined Dec 2003, 1893 posts, RR: 15
Reply 2, posted (9 years 9 months 1 week 4 days 3 hours ago) and read 4773 times:

PSU,

Im with you, I will not call it by McNamara, it is the WorldGateway...(just like I will NOT announce DCA but what its name is...it IS NATIONAL Airport and not that other man).

The delay for opening WorldGateway was also because of 9/11...since security procedures were going to change, the company used the advantage of not having to "redo" things, instead of just build them into the terminal.



THANK YOU FOR FLYING NORTHWEST AIRLINES, WE TRULY APPRECIATE YOUR BUSINESS!
User currently offline7E72004 From United States of America, joined Mar 2004, 3587 posts, RR: 2
Reply 3, posted (9 years 9 months 1 week 4 days 3 hours ago) and read 4775 times:

thanks for the info...i also don't think the new IND will be that huge...but i wonder why they did not go with the linear concourse concept (like DTW) instead of the proposed two concourses.


The next generation of aircraft is just around the corner!
Top Of Page
Forum Index

This topic is archived and can not be replied to any more.

Printer friendly format

Similar topics:More similar topics...
How Long Did The VFW614 Serve? posted Thu Feb 12 2004 16:42:51 by SU184
How Long Is The IL-62 Likely To Remain In Service? posted Fri Mar 17 2000 05:30:57 by Happy-flier
How Long Does It Take To Build An Aircraft? posted Tue Nov 6 2001 10:35:46 by VS744
How Long Does It Take To Build A Runway posted Sat Jan 15 2000 01:30:00 by Doug
How Long Did UAL Use The DC-8? posted Fri Aug 9 2002 10:02:06 by Brons2
How Long Did Delta Have The A310 In The Fleet? posted Sat Mar 16 2002 04:58:37 by 777-200
How Long For The Diversions To Be Sorted Out? posted Wed Sep 12 2001 04:21:51 by Teej13
How Long Till HF/BY Go Back To The Old Liverys? posted Sat Aug 25 2001 19:33:30 by B737-700
How Long Will The A380 Last? posted Sat Sep 23 2006 05:50:16 by COIAH756CA
How Soon Do The Coke Points Post To Delta Miles? posted Sun Jul 23 2006 07:05:01 by SlcDeltaRUmd11