FLL: Upcoming Runway Cleaning/Resurfacing Project

Sat Sep 11, 2004 1:43 pm

Would anybody know the timetable @ FLL when runways 9L/27R and 13/31 are to be cleaned and resurfaced? I know that this is supposed to take place sometime this month, but I'm not sure what the effective times and dates are. I checked for closures by NOTAM, but none are listed. They were given in the South Florida Sun-Sentinel a while back, but the article is no longer accessible on their website. Thanks for the help.

P.S. - Any info on the new soft-surface, anti-overrun arresting system that is going to be installed at the end of the runway(s) at the same time as the resurfacing project? I'm curious as to its tested effectiveness.