What airports are under going a major overhaul. Here at MSP things are starting to change. I heard that the observation deck might be turned into a fitness center. I hope that this isn't the case as people can watch the E, D, C, B, A gates. Other changes are taking place in Northstar crossing. Many new restaurants will be added.
 
Dalmd88
Posts: 2412
Joined: Fri Jul 28, 2000 3:19 am

RE: Terminal Overhauls

Tue Mar 15, 2005 6:14 am

For DL we just opened the new BOS terminal and ATL and JFK are in work. I think AA is also redoing their JFK terminal. Atl is also constructing an new international terminal. Not much can be seen yet of it though. They are still working below grade level.
 
WA727
Posts: 164
Joined: Wed Feb 02, 2005 9:56 am

RE: Terminal Overhauls

Tue Mar 15, 2005 7:29 am

Asmtrd,

I heard that airlines not affiliated in some way with NW (Sky Team?) will be moving to the HHH Terminal. I've looked at the expansion plans for both terminals on the airport's website. Pretty impressive.

At PHX Sky Harbor, a new south concourse for WN opened last week.
Don't just stand there, go get some glue!
 
stlgph
Posts: 9054
Joined: Tue Oct 12, 2004 4:19 pm

RE: Terminal Overhauls

Tue Mar 15, 2005 7:39 am

At STL-

A new Chili's is opening up soon in the A Concourse. A Brooks Brothers is apparently in the works but last time I was there didn't see when/where they are building it.

A third runway is expected to be completed......well......yeah

In other news....a new Starbucks has opened at the end of the jetbridge for the C2 gate....and work on the new JetBlue terminal is progressing well.
if assumptions could fly, airliners.net would be the world's busiest airport
 
jetblueatjfk
Posts: 1556
Joined: Sun Jan 02, 2005 4:42 am

RE: Terminal Overhauls

Tue Mar 15, 2005 11:13 am

AA at JFK is coming along. The satellite is inform so it is inside work for now and outside work on the bigger building. B6 has their hangar pretty much done at JFK (but that isn't considered a terminal but it is B6 updates at JFK and not much at T5 yet. I guess it is still planning and setting up.

 airplane jetBlueAtJFK airplane 

[Edited 2005-03-15 03:16:48]
 
pogo
Posts: 321
Joined: Fri Mar 04, 2005 1:58 am

RE: Terminal Overhauls

Tue Mar 15, 2005 6:27 pm

LHR having a little bit of work done.
New Terminal 5

Terminal 3 extension for A380's.

Taxiways have been re-newed.

Once BA moves to T5 most of T2 operations will move to T4 so T2 can be demolished, not sure of what will be built there though?

The curent control tower will become an observation point.
When in doubt give it a clout
 
flymia
Posts: 6810
Joined: Thu Jun 14, 2001 6:33 am

RE: Terminal Overhauls

Tue Mar 15, 2005 11:18 pm

MIA is also. They are building a super councourse for AA and partners. But it is difficult task because they are building it where AA flys now. Also new councourse J is being built and should be up and running in maybe a year.
"It was just four of us on the flight deck, trying to do our job" (Captain Al Haynes)
 
xjramper
Posts: 2318
Joined: Wed Dec 10, 2003 1:10 am

RE: Terminal Overhauls

Tue Mar 15, 2005 11:32 pm

I know it means nothing...but TOL is redoing their terminal. Supposedly state of the art.

XJR
Look ma' no hands!
 
ord
Posts: 1356
Joined: Tue Jul 20, 1999 10:34 pm

RE: Terminal Overhauls

Tue Mar 15, 2005 11:39 pm

"For DL we just opened the new BOS terminal..."

The terminal does not actually open for business to the public until Wednesday, March 16, so it's not quite open just yet.
 
User avatar
drerx7
Posts: 4223
Joined: Fri Jun 30, 2000 12:19 am

RE: Terminal Overhauls

Tue Mar 15, 2005 11:40 pm

At IAH-- Terminal A has been redone, Terminal B has been renovated inside, Terminal C is in the process of refreshening (the north concourses have been completed) Terminal D is in excellent shape, Terminal E is all new, and the new FIS facility is open.

At Hobby--The entire airport is in the process of being remodelled--A new central 24 gate concourse is complete with construction of the east concourse beginning soon.
Third Coast born, means I'm Texas raised
 
dtwclipper
Posts: 6668
Joined: Wed Oct 29, 2003 3:17 am

RE: Terminal Overhauls

Tue Mar 15, 2005 11:45 pm

DTW is still under construction. Not only at the NW Worldgateway, but the project for the New North Terminal.

http://www.metroairport.com/project/
Compare New York Air, the Airline that works for your Business
 
PHLB707320B
Posts: 15
Joined: Fri Mar 11, 2005 5:15 am

RE: Terminal Overhauls

Wed Mar 16, 2005 12:04 am

MKE is widening and adding a hammerhead to concourse C.
 
goomba
Posts: 244
Joined: Wed Mar 10, 2004 11:55 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 12:56 am

I guess it depends on where in ATL you are looking. I just flew AirTran this past week to LAS and Terminal C at ATL is disgusting. That carpet has probably been there since 1975.
 
cltguy
Posts: 541
Joined: Fri Sep 24, 2004 10:54 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 3:16 am

CLT upgrades:

-New 3,000 space parking deck opening next month.
-Reconditioning 18R runway is underway (at night)
-3rd Parallel Runway design is about complete...construction will start late 2005.
-Area around Concourse E is being prepped for a 25 Gate expansion.
-Renovate Baggage Claim area

On the Horizon:
-Another 3,000 space parking deck
-Expand Concourse B (about 10 additional gates)
-Build International Terminal
-Build Hotel connected to new Terminal building
-New connection to I-85
-Relocate Rental Car area
-Install People Mover to connect to future Rapid Transit station.

Here is a pic of the master plan:

 
Lemurs
Posts: 1320
Joined: Sat Mar 12, 2005 5:13 am

RE: Terminal Overhauls

Wed Mar 16, 2005 3:27 am

SEA has been under construction with the building of A terminal for a few years now...every time I think it's got to be done soon, there's more plywood hallways put up.

For a stretch during the last 12 months or so, it was to the point where I'd fly in and out every 3 days, and each time I went through the airport, the temporary plywood hallways (to hide you from the construction) would have changed shape and direction. It was VERY disorienting since I am quite used to the airport at this point.

All they needed was the pinata...
There are 10 kinds of people in the world; those who understand binary, and those that don't.
 
william
Posts: 1622
Joined: Thu Jun 10, 1999 1:31 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 3:36 am

Why is T2 at Heathrow being torn down?
 
ACYWG
Posts: 259
Joined: Thu Feb 17, 2005 7:20 am

RE: Terminal Overhauls

Wed Mar 16, 2005 4:15 am

Terminal 1 at YYZ is undergoing redevelopment I guess you could say. They've torn down the original T1 and have opened a new T1 with another concourse ready to be opened in the coming years.
 
pogo
Posts: 321
Joined: Fri Mar 04, 2005 1:58 am

RE: Terminal Overhauls

Wed Mar 16, 2005 6:59 am

Quoting WILLIAM (Reply 15):
Why is T2 at Heathrow being torn down?

Not exactly sure, but it is a bit ancient, I actually work in T2 and the ramp is very limited for parking of equipment (as is most of the airport) and some of the stands are very tight.

T2 only has 14 bridged stands, although there are 2 or 3 stands on the europier at T1 that can be used for T2 handlers.

T2 was the first terminal built, then everything else was built around it. so maybe they will spread it out a bit.
When in doubt give it a clout
 
Scott4AA
Posts: 319
Joined: Sat Apr 06, 2002 11:36 am

RE: Terminal Overhauls

Wed Mar 16, 2005 9:29 am

For some reason I thought DFW and/or AA were refurbishing terminals A & C at Dallas/Fort Worth. Does anyone have any information to back this up or I am just dreaming?
American Airlines - We Know Why You Fly
 
hjulicher
Posts: 656
Joined: Wed Feb 02, 2005 2:26 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 9:43 am

Although already mentioned, not much was said. DTW is undergoing a complete renovation. After the airports 4th parallel runway was built allowing for 4 simultaneous landings, the McNamara terminal was build. Now, the McNamara terminal concourses B and C are being expanded, and the smith and Davey terminals are going to be demolished while a new North Terminal will be built. Along with that, the Berry Terminal will also be demolished. By completion, DTW will be one of the most efficient and state of the art airports in the world. I have a feeling that DTW will grow very fast. I am not biased, just my honest opinion.
LH 442
 
User avatar
ERJ170
Posts: 5481
Joined: Thu Apr 15, 2004 11:15 am

RE: Terminal Overhauls

Wed Mar 16, 2005 10:22 am

thast CLT picture doest remindeth me a little bit of RDU-ith...
Aiming High and going far..
 
User avatar
zippyjet
Posts: 5089
Joined: Tue Sep 04, 2001 3:32 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 10:52 am



Here at BWI, it can best said as"But Wait, There's More!.By the summer, the kingdom of WN will have its spanking new concourse A up and running. Plus, food and beverage outlets such as Outback, Bill Bateman's and a whole host of epicurean delights will be opening. The upper roadway is expanding and we, [img] http://domains-unlimited.com/aviation/imageprod/fl504.jpg[/img] are expanding and rennovating our ticketing area! http://www.bwiairport.com/about_bwi/expansion_plans/. Stay tuned  Smile  airplane 
I'm Zippyjet & I approve of this message!
 
User avatar
jetjack74
Posts: 6585
Joined: Sun Jul 27, 2003 6:35 am

RE: Terminal Overhauls

Wed Mar 16, 2005 12:40 pm

What about all the orange cones all over the A concourse at DTW. Looks like the roads in Michigan aren't the only surface that has potholes.
Made from jets!
 
ckfred
Posts: 4734
Joined: Wed Apr 25, 2001 12:50 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 1:20 pm

Goomba:

The carpeting in Concourse C at ATL couldn't have been there since 1975. The new terminal comples opened in the early 1980s.

ORD is installing new canopies on the fronts of Terminals 2 and 3. They will extend over the first 2 lanes of traffic.

The front walls of the terminals are being moved about 20 feet to meet the sidewalks. The baggage claims are being renovated, and the ticketing areas will then be remodeled and reconfigured.
 
User avatar
zippyjet
Posts: 5089
Joined: Tue Sep 04, 2001 3:32 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 1:36 pm

Goomba:

The carpeting in Concourse C at ATL couldn't have been there since 1975. The new terminal comples opened in the early 1980s


To be exact, ATL generation III opened on 23 Sept., 1980. Basically, the gaudy bad taste 70's ran over into 1980 and 1981. The big hair 80's really didn't get under way till '82. So, your colors and design still had diarrhea orange and brown as prominent colors. Concourse C and D at ATL have taken a lot of use and abuse and therefore, their facelifts were welcome. Also, new HVAC systems were installed. And, with smoking lounges throughout these terminals, the smoke also roaches out carpet, and other interior fixtures.  airplane 


Notice that these threads look like the same color scheme as the outside of ATL on the ramp!
I'm Zippyjet & I approve of this message!
 
WA727
Posts: 164
Joined: Wed Feb 02, 2005 9:56 am

RE: Terminal Overhauls

Wed Mar 16, 2005 1:46 pm

Quoting Hjulicher (Reply 19):
After the airports 4th parallel runway was built allowing for 4 simultaneous landings, the McNamara terminal was build

Is there really a need, or is it possible for 4 simultaneous landings at DTW? The runways are somewhat staggered. At PHX, we have three parallel runways and there's never more than two simuls at a time. It's quite a site when the planes are lined up just right. The south runway (29L/7R) is too close to 29R/7L to allow for a triple. Sorry for the digression from the topic.
Don't just stand there, go get some glue!
 
UnitedFlyer
Posts: 252
Joined: Wed Mar 03, 2004 2:43 pm

RE: Terminal Overhauls

Wed Mar 16, 2005 4:28 pm

The MFR terminal building will be replaced by 2009 with a new state of the art building with 4 or 5 jetways. A new taller control tower will also be built. There is also discussion of extending runway 14-32 from 8800 to 10,000 feet and converting runway 9-27 from a crosswind into a parallel runway.
 
DAL767400ER
Posts: 5084
Joined: Wed Feb 09, 2005 2:47 am

RE: Terminal Overhauls

Wed Mar 16, 2005 8:15 pm

JAX is in the slow process of being completely redone. The new parking garage already opened some years ago, and the main terminal building with ticketing/check-in and baggage claims has also already been expanded significantly. Currently, the airside is in the process of being redone, from a 3-way concourse system to a single large concourse. Unfortunately I don't know any data about it, as JAX' website is only an uninformative PoS.
HAM only recently opened the pier extension, adding 6 jetways and 14 bus stations to the terminal. The new Terminal 2 is also close to being finished, and will be officially opened early this summer. Not to forget is the new parking rotunda, offering an additional 2200 parking spots, with even more on the way. And not to forget, construction on the rail link are also well underway for a completion in 2007. Other projects include and airport hotel and a shopping plaza.
 
goomba
Posts: 244
Joined: Wed Mar 10, 2004 11:55 pm

RE: Terminal Overhauls

Thu Mar 17, 2005 5:24 am

CKfred:

Thanks for the correction. I was sort of being over exaggerative to the point. I didn't really mean 1975. What I meant was that the carpet looks 30 years old.