Hello all


I was thinking now that Boeing introduce B777F whats the chance of B787F?
Different size of a/c for different size of market.
 
Areopagus
Posts: 1327
Joined: Thu Sep 20, 2001 12:31 pm

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 2:11 pm

Long term:  checkmark certain. The 787 fuselage is designed with freight in mind.
Short term:  rotfl  The production line will be busy with passenger variants for a long time.
 
m404
Posts: 1875
Joined: Tue Nov 25, 2003 4:43 pm

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 3:38 pm

This has been asked many times (myself included) and supposedly members quoting Boeing sources as saying the frame wasn't made to handle higher all-freight weights - enough to make it viable. Now that was before the design fas finalized so maybe things have changed.
Less sarcasm and more thought equal better understanding
 
User avatar
kc135topboom
Posts: 11002
Joined: Sun Jan 30, 2005 2:26 am

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 3:57 pm

Quoting Areopagus (Reply 1):
Long term: certain. The 787 fuselage is designed with freight in mind.
Short term: The production line will be busy with passenger variants for a long time.



Quoting M404 (Reply 2):
This has been asked many times (myself included) and supposedly members quoting Boeing sources as saying the frame wasn't made to handle higher all-freight weights - enough to make it viable. Now that was before the design fas finalized so maybe things have changed.

If Boeing is serious about offering the B-787 to the USAF as their new tanker, they will be coming out with a B-787F design soon. Airbus, who also wants to build the new USAF tanker just recently began designing the A-330F.

USAF will not be interested in a passenger version of any airplane for the new tanker. The airplane will have to start out as a freighter first, to be considered in the compitition.

If Boeing gets the new tanker contract, they have excess production capability in Long Beach to build it and not interfer with a B-787-800/-900/1000 passenger jet production line.
 
Areopagus
Posts: 1327
Joined: Thu Sep 20, 2001 12:31 pm

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 5:22 pm

Quoting KC135TopBoom (Reply 3):
If Boeing gets the new tanker contract, they have excess production capability in Long Beach to build it and not interfer with a B-787-800/-900/1000 passenger jet production line.

If a 787 only spends 3 days in the assembly hall in Everett, I'm skeptical that another assembly hall in Long Beach is going to help much. Some vendors are colocating plants in Everett, and their components would have to be flown down to Long Beach. Production rates would have to be raised all through the supply chain either way. Isn't there spare capacity in the big building at Everett, anyway?
 
pavlin
Posts: 391
Joined: Sun Oct 23, 2005 5:34 am

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 6:33 pm

Quoting Areopagus (Reply 1):
Short term: rotfl The production line will be busy with passenger variants for a long time.

True. Freighters always come late. Boeing should increase 787 production together with some freighters. Everyone would benefit from it (less pollution, lower operating costs....)
 
User avatar
kc135topboom
Posts: 11002
Joined: Sun Jan 30, 2005 2:26 am

RE: Whats The Chance Of Introducing B787F?

Wed Mar 15, 2006 7:13 pm

Quoting Areopagus (Reply 4):
I'm skeptical that another assembly hall in Long Beach is going to help much. Some vendors are colocating plants in Everett, and their components would have to be flown down to Long Beach.

If the B-787F were to be selected as the new tanker, that would still be cheaper than building the KC-30 in France, then flying it to Alabama for installation of the tanker equipment.
 
UNDBoeingNut
Posts: 13
Joined: Thu Dec 22, 2005 1:16 pm

RE: Whats The Chance Of Introducing B787F?

Thu Mar 16, 2006 1:36 am

Quoting Areopagus (Reply 4):
Isn't there spare capacity in the big building at Everett, anyway?

Not quite, especially with the 787 taking up the open bay the former refurb line, the only way there is extra room is if the 767 is cancelled and they want to retool that line for the 787 and not something else instead. That would put 3 747 bays then a 787 then 2 777 then a 787. (hey, you could take some of the parking lots and make another line, that would go over great in Everett, besides with the sounds of things there should be quite a few 787s just sitting there completed awaiting certification then to most likely be batch delivered.)
AE
 
DAYflyer
Posts: 3546
Joined: Wed Sep 08, 2004 9:35 pm

RE: Whats The Chance Of Introducing B787F?

Thu Mar 16, 2006 2:44 am

Quoting M404 (Reply 2):
This has been asked many times (myself included) and supposedly members quoting Boeing sources as saying the frame wasn't made to handle higher all-freight weights - enough to make it viable. Now that was before the design fas finalized so maybe things have changed.

Perhaps then it would be more suitable for companies like Fedex, like they did with the A-380.
One Nation Under God
 
Areopagus
Posts: 1327
Joined: Thu Sep 20, 2001 12:31 pm

RE: Whats The Chance Of Introducing B787F?

Thu Mar 16, 2006 5:54 am

Quoting UNDBoeingNut (Reply 7):
the only way there is extra room is if the 767 is cancelled

I imagine that if the USAF buys 787 tankers, the 767 will be discontinued.
 
kaitak744
Posts: 2086
Joined: Fri Jul 22, 2005 1:32 pm

RE: Whats The Chance Of Introducing B787F?

Thu Mar 16, 2006 1:17 pm

Quoting KC135TopBoom (Reply 3):
If Boeing gets the new tanker contract, they have excess production capability in Long Beach to build it and not interfer with a B-787-800/-900/1000 passenger jet production line.



Quoting Areopagus (Reply 4):
Quoting KC135TopBoom (Reply 3):
If Boeing gets the new tanker contract, they have excess production capability in Long Beach to build it and not interfer with a B-787-800/-900/1000 passenger jet production line.

If a 787 only spends 3 days in the assembly hall in Everett, I'm skeptical that another assembly hall in Long Beach is going to help much. Some vendors are colocating plants in Everett, and their components would have to be flown down to Long Beach. Production rates would have to be raised all through the supply chain either way. Isn't there spare capacity in the big building at Everett, anyway?

Well, If Boeing builds a 787 in LGB, it would be at no expence. Since all they do is fly the parts there on a Boeing Beluga, all you need in LGB is a work force and the tools.

You could basically build a 787 anywhere actually. All you need are tools, workers, a hangar, and a paint shop.

Quoting UNDBoeingNut (Reply 7):
Not quite, especially with the 787 taking up the open bay the former refurb line, the only way there is extra room is if the 767 is cancelled and they want to retool that line for the 787 and not something else instead. That would put 3 747 bays then a 787 then 2 777 then a 787. (hey, you could take some of the parking lots and make another line, that would go over great in Everett, besides with the sounds of things there should be quite a few 787s just sitting there completed awaiting certification then to most likely be batch delivered.)

Well, there are 6 lines at Everett.


View Large View Medium
Click here for bigger photo!

Photo © Victor Lim



Originally, it was 3 for the 747.
Then 4, 1 for 767 and 3 for 747.
Then 6, 1 for 767, 1 for 777, 3 for 747, and 1 empty.
Now, its 2 for 747 (I don't know how), 1 for 767, 1 for 777, 1 for 787, and 1 empty.
Boeing might make the 747-8 on one line, so, in the future, It could be 2 for 777, 2 for 787, 1 for 747, and 1 empty.

(if they create a 787F, and/or 787 tanker, the 767 is pointless.)
 
trex8
Posts: 4603
Joined: Sat Nov 02, 2002 9:04 am

RE: Whats The Chance Of Introducing B787F?

Fri Mar 17, 2006 2:00 am

the problem isn't assembly line space,rate limiting factor is the ability of contractors to feed the assembly line!! eg Alenias present factory cannot make more than 10 fuselage assemblies/month. they would need to build a new building, get new ovens etc, the 6 million $ question is will they??