I am receiving Airbus's newsletter which announced the 7000th aircraft delivery to US Air (an A320). The article mentioned that Airbus has achieved this milestone two years after the delivery of the 6000th airframe. This means a production rate of an average 500 airframes per year.
Reading further on I learned that Airbus has delivered since its foundation 6,985 airframes with a backlog of 4,483 airframes. A quick calculation shows that at current production rate it will take Airbus almost 9 years to deliver the current orders in its book.

That brings me to some interesting questions:
1. Which airline is willing to wait so long for their orders?
2. Does Airbus includes in their order numbers both firm orders and non-firm orders?
3. If the answer to Q2 is yes, then how many orders are likely to be delivered? and,
4. Although different for each aircraft type, what is the actual wait time for an airline from signing a firm order till they receive their aircraft?

Thanks,

An225
 
B777LRF
Posts: 1437
Joined: Sun Nov 02, 2008 4:23 am

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 10:16 am

1: When an airline orders 20, 50, 100 or 200 of a type already in production, you may safely assume the deliveries will be spread over several to very many years, in line with the airline's growth and/or fleet replacement plans. If an airline orders equally large numbers of an aircraft that's still in development, a delivery schedule spanning more than a decade from time of order is not unusual at all. Even airlines ordering relatively small numbers may specify a delivery date 5 or more years into the future, if that's what the crystal ball in network planning says is the right thing to do. The answer to your question is therefore "Anyone who orders a fair chunk or with long-term plans".
2: Don't know
3: Question not understood
4: The delivery schedule to any single airline is not only driven by how fast a manufacturer can get the finished product out the door, as explained above.
From receips and radials over straight pipes to big fans - been there, done that, got the hearing defects to prove
 
User avatar
Heavierthanair
Posts: 834
Joined: Tue Oct 31, 2000 11:20 pm

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 10:39 am

G'day

Some annual production rates compiled from http://www.eads.com/dms/eads/int/en/...GIF-2011/FBregier%20GIF%202011.pdf

Model.....2011....2012....2013....2914....2015

320...........440......460......480......500......520
330.............92......103......115......115.......115
350...................................................20.........60
380.............26........30.........40........40.........40

Total.........558......593.......625......675......735

Some figures have been assumed (A350) and others extrapolated, they should be close though. While impressive and comfortable, the backlog is not as long as it appears to be. Most orders are staggered over several years, some up to 10 years. Also Airbus used the practice of overbooking its production line to compensate for airlines going out of business and for order cancellations.

So even though the production lines seem to be booked out there are windows to accommodate early deliveries for strategic customers, the recent order for AA comes to mind. There will be others for sure.

Cheers

Peter

[Edited 2011-12-18 02:42:26]
"Two things are infinite: the universe and human stupidity; and I'm not sure about the universe." (Albert Einstein, 1879 - 1955)
 
An225
Topic Author
Posts: 212
Joined: Tue May 31, 2005 6:37 pm

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 11:14 am

Thanks B777LRF and Heavierthanair for the answers.
It makes the whole thing much more understood

An225
 
chiad
Posts: 986
Joined: Tue May 16, 2006 4:24 pm

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 11:36 am

Quoting Heavierthanair (Reply 2):

G'day

Some annual production rates compiled from http://www.eads.com/dms/eads/int/en/...GIF-2011/FBregier%20GIF%202011.pdf

Model.....2011....2012....2013....2914....2015

320...........440......460......480......500......520
330.............92......103......115......115.......115
350...................................................20.........60
380.............26........30.........40........40.........40

Total.........558......593.......625......675......735

Thanks! I have been looking for ust this data!!
 
RubberJungle
Posts: 302
Joined: Thu Jan 28, 2010 10:16 am

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 11:55 am

Quoting An225 (Thread starter):
A quick calculation shows that at current production rate it will take Airbus almost 9 years to deliver the current orders in its book.

It's not quite like that. When you take into account increased A320 production rates, the current A320 backlog would burn up by mid-2018, which is only six and a half years. Likewise the A330 backlog would run out in early 2015, the A380s in mid-2016.

That's purely based on production rates, not the agreed delivery times, but it's still a valid point I think. A simple production rate calculation also neglects to take into account the fact that deliveries in the second half of the decade will include brand new aircraft types.
 
AngMoh
Posts: 739
Joined: Fri Nov 04, 2011 5:03 am

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 1:03 pm

Quoting RubberJungle (Reply 5):
It's not quite like that. When you take into account increased A320 production rates, the current A320 backlog would burn up by mid-2018, which is only six and a half years.

And if you read the latest EADS investor communication slides, it shows that the A320 is deliberately overbooked to take into account cancelled orders in order to keep production at the maximum capability of the line. So Airbus assumes that a certain percentage of the orders will be cancelled, and the further away the bookings are, the higher this percentage is.
 
Extra300
Posts: 86
Joined: Wed Sep 21, 2011 8:04 pm

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 6:01 pm

Quoting Heavierthanair (Reply 2):
Model.....2011....2012....2013....2914....2015

320...........440......460......480......500......520
330.............92......103......115......115.......115
350...................................................20.........60
380.............26........30.........40........40.........40

Total.........558......593.......625......675......735

Thanks for this summary, very appreciated  

I think you are a little too optimistic on the A350. I expect maximum 10 frames to be delivered in 2014, and maybe 40 in 2015. Even for the A330 the numbers are a little high.
The total for 2011 is more like 520 aircraft.

After reading this thread and the link to the EADS document, I expect Airbus to reach 600 aircraft/year in 2014, or maybe even in 2013, which still is very impressive.

But 700/year seems far away, since I expect the A330 to decrease once the A350 is in the air, and harder competition on the single aisle market (Comac 919, and maybe even a 150 seater from Embraer)
 
dlphoenix
Posts: 81
Joined: Thu Aug 09, 2007 7:30 am

RE: Airbus Orders Backlog And Customes Wait Time

Sun Dec 18, 2011 10:20 pm

Quoting An225 (Thread starter):
That brings me to some interesting questions:
1. ...
2. Does Airbus includes in their order numbers both firm orders and non-firm orders?
3. If the answer to Q2 is yes, then how many orders are likely to be delivered? and,

The answer to 2 is straight forward - publicly traded companies can only list firm orders.
What makes an order "firm" is subject to interpretation but in the case of Boeing and Airbus it involves not only a written commitment but also a down-payment.

Despite the answer to 2 there are cases where orders are canceled / converted to orders for different type etc. The rate depends mainly on the global economy and is therefore hard to predict.

DLP
 
User avatar
lightsaber
Crew
Posts: 11830
Joined: Wed Jan 19, 2005 10:55 pm

RE: Airbus Orders Backlog And Customes Wait Time

Mon Dec 19, 2011 4:17 pm

Quoting Heavierthanair (Reply 2):
Model.....2011....2012....2013....2914....2015

320...........440......460......480......500......520
330.............92......103......115......115.......115
350...................................................20.........60
380.............26........30.........40........40.........40

Total.........558......593.......625......675......735

Thank you for the numbers. IMHO, Airbus now needs to 'sell A330Fs' to keep those numbers up.
I have no worries on the A320, A350 (ok, EIS time... but that is normal today), or A380 sales to fill those slots.

Quoting RubberJungle (Reply 5):
When you take into account increased A320 production rates, the current A320 backlog would burn up by mid-2018, which is only six and a half years. Likewise the A330 backlog would run out in early 2015, the A380s in mid-2016.

I'm posted again and again I believe A380 sales are hampered by long waits for aircraft.

The A330 needs fresh sales which will be tougher once the 787 and A350 enter 'mass production.' Unless FX orders freighters...   

Quoting Extra300 (Reply 7):
Even for the A330 the numbers are a little high.

They are Airbus' numbers.

Lightsaber
"They did not know it was impossible, so they did it!" - Mark Twain
 
wimdemeester
Posts: 24
Joined: Sat Dec 10, 2011 10:35 am

RE: Airbus Orders Backlog And Customes Wait Time

Mon Dec 19, 2011 4:55 pm

the backlog looks like 4483 for all types as per the end of November. But what would be a more realistic number if we take into consideration firm orders for for instance Grupo Marsans, Kingfisher, Kingfisher Red, America West, NW and UAL, Mandala and so on? The numbers for these and others count up and may represent several hundreds without almost any chance of delivery at all.

But having said that what remains is still to be considered an unprecedented number of certain orders!
 
United727
Posts: 351
Joined: Sat Nov 13, 2010 1:26 am

RE: Airbus Orders Backlog And Customes Wait Time

Tue Dec 20, 2011 3:01 am

Quoting wimdemeester (Reply 10):
America West, NW

HUH???  Wow!

Do you mean US and DL?

[Edited 2011-12-19 19:02:52]
 
Extra300
Posts: 86
Joined: Wed Sep 21, 2011 8:04 pm

RE: Airbus Orders Backlog And Customes Wait Time

Tue Dec 20, 2011 8:15 am

[

Quoting lightsaber (Reply 9):
Quoting Extra300 (Reply 7):Even for the A330 the numbers are a little high.
They are Airbus' numbers.

You´re right about that, but still the total numbers a too high. It is not likely Airbus will produce 558 aircraft 2011. If we subtract 5-8% from the list I think we will be closer to reality. 520 is more likely for 2011

I don´t know if Airbus counts 12 productions month/year? Maybe 11 because of summer holidays?
 
scouseflyer
Posts: 2165
Joined: Wed Apr 26, 2006 7:02 pm

RE: Airbus Orders Backlog And Customes Wait Time

Tue Dec 20, 2011 8:29 am

Quoting wimdemeester (Reply 10):
the backlog looks like 4483 for all types as per the end of November. But what would be a more realistic number if we take into consideration firm orders for for instance Grupo Marsans, Kingfisher, Kingfisher Red, America West, NW and UAL, Mandala and so on? The numbers for these and others count up and may represent several hundreds without almost any chance of delivery at all.

That is true but whilst a contract remains in place and Airbus is holding their deposits, then order is still firm.
 
Ruscoe
Posts: 1577
Joined: Sun Aug 22, 1999 5:41 pm

RE: Airbus Orders Backlog And Customes Wait Time

Tue Dec 20, 2011 12:40 pm

An interesting exercise with the Airbus backlog is the discrepency between stated value of unit backlog and actual sell price per unit.For 2010 I make it about 55million per unit.

Boeing also show a discrepency but it is in the region of 6 million a unit.

I realise that aircraft are not ordered and delivered in the same year, and the mix changes, but none the less interesting.

Ruscoe
 
Burkhard
Posts: 1916
Joined: Fri Nov 17, 2006 9:34 pm

RE: Airbus Orders Backlog And Customes Wait Time

Tue Dec 20, 2011 1:10 pm

Quoting Extra300 (Reply 12):
Maybe 11 because of summer holidays?

Yes the year has eleven months in France, plus 31 days of general shut down of everthing which is not global holiday.