Runway At Taoyuan Airport Slated To Re-open

Tue Jan 03, 2012 6:32 am

According to a local newspaper, the northern runway at TPE is scheduled to be reopened next week. It was closed for three months for strengthening.

The southern runway will be closed (likely after Chinese New Year) for rebuilding. Once the southern runway is rebuilt, the northern runway will be closed for rebuilding as well -- now why they didn't just rebuild the first one from the beginning I have no idea.

http://chinapost.com.tw/taiwan/natio...ws/2012/01/03/327796/Runway-at.htm
 
christao17
Posts: 902
Joined: Sun Apr 17, 2005 12:14 pm

RE: Runway At Taoyuan Airport Slated To Re-open

Tue Jan 03, 2012 6:48 am

The article says that this was a "preliminary rehabilitation" of the northern runway and that it ran a month longer than scheduled. I would imagine that if they had tried to do the entire rebuild, it wouldn't have been done in time for the peak travel that will happen in January, a combination of Taiwan's presidential elections and (a relatively early) Chinese New Year.

Perhaps the northern runway was in such poor shape that starting with the southern runway after CNY and waiting until after that was finished to do the northern runway, just wasn't an option?
Keeping the "civil" in civil aviation...
 
User avatar
BreninTW
Topic Author
Posts: 1539
Joined: Sun Jul 02, 2006 5:31 pm

RE: Runway At Taoyuan Airport Slated To Re-open

Tue Jan 03, 2012 6:56 am

It's possible Chris ...

I guess that by the time the government finally allocated the funds, there simply wasn't time to do a complete rebuild before the rush season, so they had to do a preliminary upgrade, with a complete rebuild later (which undoubtedly costs more).

From what I've read, the southern runway has been disintegrating badly with it being the sole runway available and has required frequent patching.

Eitherway, this is long overdue -- both runways are well past their design life and urgently in need of replacing.

Doesn't help that the original contractor went bust in the middle of the refurb either!
 
CX Flyboy
Posts: 6030
Joined: Sun Dec 26, 1999 6:10 pm

RE: Runway At Taoyuan Airport Slated To Re-open

Tue Jan 03, 2012 9:06 am

runway 05R/23L is in pretty bad shape. Rolling down that runway is a teeth jittering experience, especially in a lighter aircraft where everything rattles around anyway. It really does need a lot of work, as do some of the taxiways.