MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 1:48 am

In the past two months or so there has been increased conversation about expanding and renovating MSP, somewhat in line with the oringinal 20/20 plans from NW. Just a few of the major points are:

Expand and remodel councourse G, with a new international facility and tram.
Expanding T2 (HHH) to 18 gates.
Move all non Sky Team member to T2.
Remodel concourse E.

There have been MAC commissioners and government officials voicing concerns that the plans are too ambitious and are relying on Delta maintaining and/or growing their hub status. I'm interested to hear some of your opinions.

I believe Delta will maintain its high margin hub at MSP, but I don't see them expanding anytime soon. As much as I'd like to see expansion, I have to admit it seems pretty ambitious.

With the draw down of 50 seat flying, what are the options for the small RJ gates on concourses A and B? Many of them can only handle CR2's and previously Saabs, correct? The A and B councourses are relatively new and very nice in my opinion, but it seems they were designed to cater too much for small RJs. Could they reduce the number of gates, and park larger RJ's diagonally to make them fit? Also, it still seems interesting that ZK operates out of the E concourse. They do practically only feed DL, right? If Delta really wanted more gates, could they not lease the gates ZK operates out of, and in return give ZK gates on the A or B concourses?


ZMP0PSA
 
Flighty
Posts: 7677
Joined: Thu Apr 05, 2007 3:07 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 2:06 am

A ridiculous plan with no justification. MSP traffic has fallen slightly since early-2000s peak. The present facility totally satisfies traffic needs and is convenient. Piling on costs while throwing up structural barriers to competition strikes me as totally wrong headed and insane. It would raise eyebrows of both the DOJ and the local market.
 
PHX787
Posts: 7877
Joined: Thu Mar 15, 2012 7:46 pm

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 2:13 am

Quoting ZMP0PSA (Thread starter):

With the draw down of 50 seat flying, what are the options for the small RJ gates on concourses A and B?

I hope they primarily focus on refurbishing these gates. Especially with the props being retired as well, these gates need to be refurbished so they can handle ERJs and CR9s in a better manner.
Follow me on twitter: www.twitter.com/phx787
 
Cubsrule
Posts: 11416
Joined: Sat May 15, 2004 12:13 pm

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 2:29 am

Quoting PHX787 (Reply 2):
I hope they primarily focus on refurbishing these gates. Especially with the props being retired as well, these gates need to be refurbished so they can handle ERJs and CR9s in a better manner.

Particularly on B, many of the hold rooms are too small for even 50 seaters. A gut job that leads to fewer parking spaces but more space per gate may be in order, but I doubt there will be much appetite for that in a relatively new facility like Concourse B.
I can't decide whether I miss the tulip or the bowling shoe more
 
af773atmsp
Posts: 2036
Joined: Mon Aug 28, 2006 1:37 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 4:13 am

I assume if all non Sky Team airlines move to Terminal 2, ZK would stay at Terminal 1?
It ain't no normal MD80 its a Super 80!
 
iowaman
Posts: 3878
Joined: Thu May 20, 2004 2:29 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 4:26 am

DL traffic is down at MSP since the merger. Terminal 2 has significantly increased traffic, largely due to WN (I believe Terminal 2 is handling around double the passengers in 2008 or so). I highly doubt a need 18 gates though, unless some of the larger carriers like AA UA and US are moved to Terminal 2, but why do this when trafifc is down where those airlines are currently located? Anyway I could see another couple gates onto Humphrey if WN continues to grow in MSP but I don't expect anything drastic.
 
katanapilot
Posts: 157
Joined: Fri Oct 01, 2004 2:25 pm

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 4:32 am

i definitely see the need for some modernizing and renovations. the whole airport just screams 1990's. from a function perspective, i really enjoy MSP. i fly in and out very frequently and rarely wait for anything!
 
amccann
Posts: 124
Joined: Sat Mar 08, 2008 9:14 pm

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 5:01 am

Quoting Cubsrule (Reply 3):
Particularly on B, many of the hold rooms are too small for even 50 seaters. A gut job that leads to fewer parking spaces but more space per gate may be in order,

It will be interesting to see how these gates are handled. Even many of the hold rooms for the A gates are too small for the 50 seat jets. Last time I flew out of an A gate (I believe A12 or A13) I remember counting 30 some seats in the hold room for a CRJ200.

Quoting katanapilot (Reply 6):
the whole airport just screams 1990's

I don't know if the whole airport screams 1990s. I particularly enjoy the high number C gates and the low number A gates. I feel like those are very modern and very functional. However the G gates do seem very dated.
What one person receives without working for, another person must work for without receiving. - Ronald Reagan
 
usflyer msp
Posts: 2180
Joined: Tue May 23, 2000 11:50 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 3:35 pm

Quoting Flighty (Reply 1):
A ridiculous plan with no justification. MSP traffic has fallen slightly since early-2000s peak. The present facility totally satisfies traffic needs and is convenient. Piling on costs while throwing up structural barriers to competition strikes me as totally wrong headed and insane. It would raise eyebrows of both the DOJ and the local market.

I agree that the much of the plan is not needed at this point. However, I fail to see how it throws up structural barriers to competition, especially to the point of DOJ intervention. Do you care to explain further?
 
FWAERJ
Posts: 2586
Joined: Wed Jun 07, 2006 1:23 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 6:25 pm

Quoting amccann (Reply 7):
However the G gates do seem very dated.

DL is in the process of renovations to Concourse G, particularly in the food/beverage offerings.
"Did he really need the triple bypass? Or was it the miles?"
 
MSPNWA
Posts: 1790
Joined: Thu Apr 23, 2009 2:48 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 10:01 pm

Quoting ZMP0PSA (Thread starter):

Expand and remodel councourse G, with a new international facility and tram.
Expanding T2 (HHH) to 18 gates.
Move all non Sky Team member to T2.
Remodel concourse E.

-Concourse G is by far my least favorite. I would be in favor of a significant renovation along those lines to make it more passenger-friendly and aesthetically pleasing.

-I think eventually the Humphrey Terminal (never going to say T2) will need more gates, but I think that's a long ways off. The current expansion of a second security checkpoint should hold things over for now.

-Totally not in favor of it. Delta and SkyTeam will never need more than their current capacity. I like Humphrey, but there so much more to do in Lindbergh. You would have to expand Humphrey. Costs would go up overall. Shops in Lindbergh would lose revenue. Etc. No one is happy in this scenario. Use what we have now.

-I don't know why E is singled out. I guess I've never noticed it being significantly worse than the other concourses.


To me the biggest consequence of airline trends has been the large influx of RJs. Now the A, B, and C concourses are jammed. It creates congestion around the gates and more connections with long walks. But I don't see an easy way out of that problem. Maybe the up coming reduction in 50-seaters will help, hopefully without reducing total passengers through MSP.
 
User avatar
TVNWZ
Posts: 1655
Joined: Fri Feb 17, 2006 9:28 am

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Mon Nov 12, 2012 10:24 pm

Quoting Flighty (Reply 1):
It would raise eyebrows of both the DOJ

The only remote way eyebrows would be raised is when DOJ employees fly into/through MSP and their trip is either better or worse.
 
msp747
Posts: 299
Joined: Sat May 29, 2010 6:42 pm

RE: MSP Expansion/2020 Plan, Future Of A/B Concourses

Tue Nov 13, 2012 1:41 am

MSP's international terminal is severely lacking when compared to other hubs. It is too small to handle the current international flights, which leaves no room for adding additional flights. So while the airport doesn't need an entirely new concourse, like the proposed H concourse in the 20/20 plan, future improvements need to be discussed.