Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 12:35 am

ChannelNewsAsia report and video clip

Construction of the complex is completed. The interiors are being fitted now. It will be opened in the second half of 2017.

T4 will reportedly have a strong focus on automation including facial recognition technology.
Cathay Pacific, Korean Air, Vietnam Airlines and the three AirAsia airlines have announced they will operate out of T4
 
flight152
Posts: 3463
Joined: Fri Nov 24, 2000 8:04 am

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 12:50 am

Soooo construction isn't complete if the interior isn't finished. What am I missing?
 
anshabhi
Posts: 2258
Joined: Thu Oct 20, 2016 10:40 am

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 3:38 am

Nice to know that. SIN is undoubtedly the most modern airport in world. I would love to go to T4 when it completes!
 
User avatar
atcsundevil
Moderator
Posts: 4345
Joined: Sat Mar 20, 2010 12:22 pm

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 4:42 am

flight152 wrote:
Soooo construction isn't complete if the interior isn't finished. What am I missing?

It all depends on your definition. Some people consider construction complete when the exterior is closed off, others see it as when the site is ready for business.. Saying construction is complete if only the interior furnishings need to be fitted and trial runs completed would be a fair statement, since heavy construction equipment should be clear of the site if the building is closed.
 
AngMoh
Posts: 1065
Joined: Fri Nov 04, 2011 5:03 am

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 5:31 am

flight152 wrote:
Soooo construction isn't complete if the interior isn't finished. What am I missing?


The Temporary Occupation Permit (TOP) has been issued, which means the building is approved for occupation/use (i.e. it is safe to be occupied) but work is not yet 100% done. So unlike Berlin, the safety, fire protection etc is all done. It means companies which will operate from terminal 4 can set up their offices in the building and can operate from these offices and access to the building is not limited to construction personnel only. Later the TOP will be replaced by the CSC (Certificate of Statutory Completion) which means it is 100% done. Operation of terminal 4 will most likely start under the TOP and before the CSC is issued.
727 732 733 734 735 73G 738 739/ER 742 743 744/M 752 753 762 772 77E 773 77W 788 A300 A310 A319 A320 A321 A332 A333 A343 A345 A346 A359 A35K A388 DC-9 DC-10 MD11 MD81 MD82 MD87 F70 ERJ145 E170 E175 E190 E195 ATR72 Q400 CRJ200 CRJ700 CRJ900 BAE146 RJ85
 
infinit
Topic Author
Posts: 1058
Joined: Thu Jul 31, 2008 1:12 am

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 2:09 pm

AngMoh wrote:
flight152 wrote:
Soooo construction isn't complete if the interior isn't finished. What am I missing?


The Temporary Occupation Permit (TOP) has been issued, which means the building is approved for occupation/use (i.e. it is safe to be occupied) but work is not yet 100% done. So unlike Berlin, the safety, fire protection etc is all done. It means companies which will operate from terminal 4 can set up their offices in the building and can operate from these offices and access to the building is not limited to construction personnel only. Later the TOP will be replaced by the CSC (Certificate of Statutory Completion) which means it is 100% done. Operation of terminal 4 will most likely start under the TOP and before the CSC is issued.


Thank you! I couldn't have explained it better.
 
Ryanair01
Posts: 485
Joined: Fri Dec 27, 2013 9:27 pm

Re: Construction of SIN Changi Airport T4 completed

Mon Dec 19, 2016 7:41 pm

As I understand it, the TOP is issued when construction is finished (it is built) and then fit out takes place (e.g. plastering and false ceilings) and then the CSC is issued. I stand to be corrected by AngMoh though.

My complaint with T4 is that there is no MRT connection and transfers to other airlines will be difficult because of the separate location.
 
infinit
Topic Author
Posts: 1058
Joined: Thu Jul 31, 2008 1:12 am

Re: Construction of SIN Changi Airport T4 completed

Wed Dec 21, 2016 1:14 am

Ryanair01 wrote:
My complaint with T4 is that there is no MRT connection and transfers to other airlines will be difficult because of the separate location.


Yes, on the point on transfers to airlines in other terminals, T4 leaves a big question mark in mind since Changi says it won't be served by the Skytrain network. They say it will have buses to bring passengers to other terminals but it sounds to be like it's going to be confusing and not so smooth from a user experience point of view.

Say if you land in T4, would like to purchase something from T3 and then you're catching a flight from T1. From the sound of it, you'll have to use the bus between T4 to T3 and then take the Skytrain from T3 to T1.

On the point about MRT though, T4 will get a dedicated MRT stop in a few years. T5 too for that matter.
 
User avatar
Revelation
Posts: 24807
Joined: Wed Feb 09, 2005 9:37 pm

Re: Construction of SIN Changi Airport T4 completed

Wed Dec 21, 2016 1:52 am

Image
Wake up to find out that you are the eyes of the world
The heart has its beaches, its homeland and thoughts of its own
Wake now, discover that you are the song that the morning brings
The heart has its seasons, its evenings and songs of its own
 
RacheyFlies
Posts: 191
Joined: Thu Nov 17, 2016 2:48 pm

Re: Construction of SIN Changi Airport T4 completed

Wed Dec 21, 2016 8:19 am

What about the other LCC like TigerAir, Scoot, Jetstar and others will they stay in their actual Terminal? Also, will there be a lounge open there?
The best plane I've flown is an A380. They were the biggest and the best than other plane I've been on. :lol:
 
juliuswong
Posts: 2021
Joined: Wed Dec 14, 2016 3:22 am

Re: Construction of SIN Changi Airport T4 completed

Wed Dec 21, 2016 8:48 am

TurnerJet wrote:
What about the other LCC like TigerAir, Scoot, Jetstar and others will they stay in their actual Terminal? Also, will there be a lounge open there?

So far only AirAsia Group (AK, FD and QZ), Cathay Pacific, Vietnam Airlines and Korean Air are moving to T4. Scoot and Tigerair have mentioned previously they will stay put at T2 to ensure seamless connection between both. Both entities are merging into one entity by end of 2017. Jetstar currently at T1 has not issue any statement yet.
- Life is a journey, travel it well -

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos