yeogeo wrote:Another perspective on Musk's tunnel/transport project:
https://www.citylab.com/transportation/ ... le/562841/
"...one aspect of the proposed Loop concept would be incredibly valuable if Musk actually pulled it off, and not just to Chicago. That’s the cost of the tunneling itself... If the Boring Company’s cost projection of $1 billion is anywhere near accurate —that pencils out to $55.5 million per mile—[it will be] far and away the cheapest construction cost for any subterranean transit line in the U.S."
It remains to be seen whether their skepticism is justified - should be an interesting few years ahead!
EWRandMDW wrote:yeogeo wrote:Another perspective on Musk's tunnel/transport project:
https://www.citylab.com/transportation/ ... le/562841/
"...one aspect of the proposed Loop concept would be incredibly valuable if Musk actually pulled it off, and not just to Chicago. That’s the cost of the tunneling itself... If the Boring Company’s cost projection of $1 billion is anywhere near accurate —that pencils out to $55.5 million per mile—[it will be] far and away the cheapest construction cost for any subterranean transit line in the U.S."
It remains to be seen whether their skepticism is justified - should be an interesting few years ahead!
Last night I watched "Chicago Tonight - The Week in Review" on ch 11 and there was a lively debate on this topic. One question asked was what is the benefit of taking this service if your final destination is not in the immediate vicinity of Block 37. The choices are to then take a cab or Uber or hop on the L or a bus. You could have boarded a cab or the L right at ORD and possibly saved time and grief by not having to switch modes of transport and pay a second fare. Also, what if during the boring of the tunnel some long-forgotten pipe or other piece of infrastructure is breached? Who will service the system in case of a breakdown? This is a private company so they'll have to coordinate closely with city agencies and unions. The L is maintained by CTA which is a city agency having the resources to handle situations.
Finally, IF this thing is built I sure hope the vehicles don't have "LAX TERMINAL 2" as a destination sign!
_AA_777_MAN wrote:When is EL AL coming back?
piedmontf284000 wrote:EWRandMDW wrote:yeogeo wrote:Another perspective on Musk's tunnel/transport project:
https://www.citylab.com/transportation/ ... le/562841/
"...one aspect of the proposed Loop concept would be incredibly valuable if Musk actually pulled it off, and not just to Chicago. That’s the cost of the tunneling itself... If the Boring Company’s cost projection of $1 billion is anywhere near accurate —that pencils out to $55.5 million per mile—[it will be] far and away the cheapest construction cost for any subterranean transit line in the U.S."
It remains to be seen whether their skepticism is justified - should be an interesting few years ahead!
Last night I watched "Chicago Tonight - The Week in Review" on ch 11 and there was a lively debate on this topic. One question asked was what is the benefit of taking this service if your final destination is not in the immediate vicinity of Block 37. The choices are to then take a cab or Uber or hop on the L or a bus. You could have boarded a cab or the L right at ORD and possibly saved time and grief by not having to switch modes of transport and pay a second fare. Also, what if during the boring of the tunnel some long-forgotten pipe or other piece of infrastructure is breached? Who will service the system in case of a breakdown? This is a private company so they'll have to coordinate closely with city agencies and unions. The L is maintained by CTA which is a city agency having the resources to handle situations.
Finally, IF this thing is built I sure hope the vehicles don't have "LAX TERMINAL 2" as a destination sign!
The "superstation", as it was once called is at Block 37 and will be connected to red and blue lines. They are also rebuilding the state and lake elevated platform and a connection is also expected to that station as well. So that will cover all CTA trains sans the yellow. Also a decent amount of Chicago's downtown hotels are within a quarter mile or less. The rest are very close to CTA stations.
As for the two centuries of infrastructure that will be bored through, I couldn't agree more. Seems very risky. There are still a lot of sites underground that are unknown from the 19th century. What happens if they get to one of these sites? Bore around it, under it, through it? Also Musk stated that his company would sign a lease with the city which I imagine would probably be for 99 years. He stated that his company would be in charge of maintaining and upgrading the system over that time. My question is what happens if the company goes bankrupt? Then who's going to be responsible...most likely the city.
Finally, it was mentioned that Musk would be open to also building an APM at OHare under the new terminals, international terminal and to a western terminal. If true that should be the first priority over an express train. Much less digging and in my opinion much more important, as there would probably 100 times the amount of people using that compared to the express train.
Planeboy17 wrote:_AA_777_MAN wrote:When is EL AL coming back?
I have no inside knowledge but I wouldn’t expect them anytime soon. I thought for sure after a return to MIA ORD would be next, but their decision to launch SFO, a longer route that already has nonstop competition on it, shows that ORD must not be a priority. Even with lobbying from the mayor of Chicago there doesn’t seem to be much interest from El Al. They have flown to ORD on and off since the early 70s so there is plenty of history and maybe I’m completely off and they announce it next year but I wouldn’t hold out for that. Just my 2 cents.
yeogeo wrote:Let the process begin!
Emailed out today
Interesting that they included a proviso for local participation, no matter who the leads the design:
"...teams will be strongly incentivized to commit to mentoring two or more small, local firms."
ADrum23 wrote:yeogeo wrote:Things don't seem to be going especially well with the bus system subbing for the people-mover between terminals, remote parking, etc., according to this article anyway. I must say, having problems accommodating wheelchairs seems like something they should have prepared for.
https://www.bizjournals.com/chicago/new ... j=82024561
Anyone here have personal experience?
What a freaking disaster, what was Chicago thinking??? Why did they need to shut down the whole system M-F, could they not have simply rerouting trains onto one side with less frequent service and then used shuttles to supplement the reduced schedule?
And we still don't know for sure what exactly they are doing to the existing system. This is a ominous prelude of things to come when the core of O'Hare 21 gets going.......
nmdrdh787 wrote:Ginger Evans is resigning (well her contract is expiring). Being replaced by someone named Jamie Rhee, who has worked throughout various city departments including aviation.
https://www.google.com/amp/s/chicago.su ... chief/amp/
Not sure if we should be reading into this. Ginger was successful with working in collaboration with numerous consultants and others to grow Chicago's air service, redesign the runways, get a new terminal lease and use agreement, and kick off the terminal redesign. Her contract was up too.
I wish her the best of luck, and thank her for being a pleasure to work with and for her awesome work that she did over the years.
FromGSPtoChi wrote:nmdrdh787 wrote:Ginger Evans is resigning (well her contract is expiring). Being replaced by someone named Jamie Rhee, who has worked throughout various city departments including aviation.
https://www.google.com/amp/s/chicago.su ... chief/amp/
Not sure if we should be reading into this. Ginger was successful with working in collaboration with numerous consultants and others to grow Chicago's air service, redesign the runways, get a new terminal lease and use agreement, and kick off the terminal redesign. Her contract was up too.
I wish her the best of luck, and thank her for being a pleasure to work with and for her awesome work that she did over the years.
This is a bad move not bring her back. It was the first time they went out and got an aviation expert to be the Aviation Commissioner and now she is leaving. Previously the Aviation Commissioner position was just a promotion from a different city position. It was always someone with little aviation experience but next in-line. That seems to be the case again. Maybe since the heavy negotiations are over this will not have a huge impact.
ILS28ORD wrote:piedmontf284000 wrote:EWRandMDW wrote:
Last night I watched "Chicago Tonight - The Week in Review" on ch 11 and there was a lively debate on this topic. One question asked was what is the benefit of taking this service if your final destination is not in the immediate vicinity of Block 37. The choices are to then take a cab or Uber or hop on the L or a bus. You could have boarded a cab or the L right at ORD and possibly saved time and grief by not having to switch modes of transport and pay a second fare. Also, what if during the boring of the tunnel some long-forgotten pipe or other piece of infrastructure is breached? Who will service the system in case of a breakdown? This is a private company so they'll have to coordinate closely with city agencies and unions. The L is maintained by CTA which is a city agency having the resources to handle situations.
Finally, IF this thing is built I sure hope the vehicles don't have "LAX TERMINAL 2" as a destination sign!
The "superstation", as it was once called is at Block 37 and will be connected to red and blue lines. They are also rebuilding the state and lake elevated platform and a connection is also expected to that station as well. So that will cover all CTA trains sans the yellow. Also a decent amount of Chicago's downtown hotels are within a quarter mile or less. The rest are very close to CTA stations.
As for the two centuries of infrastructure that will be bored through, I couldn't agree more. Seems very risky. There are still a lot of sites underground that are unknown from the 19th century. What happens if they get to one of these sites? Bore around it, under it, through it? Also Musk stated that his company would sign a lease with the city which I imagine would probably be for 99 years. He stated that his company would be in charge of maintaining and upgrading the system over that time. My question is what happens if the company goes bankrupt? Then who's going to be responsible...most likely the city.
Finally, it was mentioned that Musk would be open to also building an APM at OHare under the new terminals, international terminal and to a western terminal. If true that should be the first priority over an express train. Much less digging and in my opinion much more important, as there would probably 100 times the amount of people using that compared to the express train.
The last part about musk building the post-security APM between all terminals, if true would be awesome and makes a lot of sense, but where did you hear this? I haven't heard or found anything on this.
piedmontf284000 wrote:So the Mayor of Chicago is letting the person who negotiated new leases with the airlines, which were 30 years old and very pro- AA and UA; developed and delivered on an historic $8.7 billion agreement to modernize O’Hare; opened two new runways and the first new gates in 25 years; undertook the largest investment plan for Midway in two decades; and attracted new airlines and services to make O’Hare the only American city to offer direct flights to all six major continents. Yeah, that makes sense. Ms Evans, who refused to kiss the backsides of the City Council members, found out for herself what is is like to work in the city of Chicago. The City Council’s Black and Hispanic Caucuses had threatened to hold up the $4 billion borrowing that will raise the mountain of O’Hare debt to $13 billion to press their demand for a fair share of jobs and contracts generated by the project. Sounds like there is a Mayoral election coming soon and the Mayor needs all the votes he can get, so he had to offer up Ms Evans as a sacrificial lamb . Further proof that the city of Chicago is still a corrupt/political patronage city.
Jamie Rhee is a political hack who was once the Chief of Staff of former Mayor Daley. She has been pushed around from one department to another for the last 24 years, but somehow she is the best fit to steer the 8.7 modernization project of O'Hare...puh-lease!! No, what she is and what she will do is make sure that only "qualified" construction firms, vendors, and suppliers will be in on the modernization project. In other words, she will make sure the Aldermen's "list" of workers get hired, so that the Aldermen can hand out patronage jobs to those in their wards who do their dirty work for them at election time. Further proof that nothing has changed in the last 60 years in Chicago. One step forward, three steps back.
Thank you Ginger Evans for bringing ORD into the 21st Century. It was nice while it lasted.
United787 wrote:What I don't understand is why they couldn't keep Evans to run the Aviation Department and put Rhee as the head of procurement for the O'Hare 21 project if they really need her for that purpose. But why have her the whole department?
piedmontf284000 wrote:FromGSPtoChi wrote:nmdrdh787 wrote:Ginger Evans is resigning (well her contract is expiring). Being replaced by someone named Jamie Rhee, who has worked throughout various city departments including aviation.
https://www.google.com/amp/s/chicago.su ... chief/amp/
Not sure if we should be reading into this. Ginger was successful with working in collaboration with numerous consultants and others to grow Chicago's air service, redesign the runways, get a new terminal lease and use agreement, and kick off the terminal redesign. Her contract was up too.
I wish her the best of luck, and thank her for being a pleasure to work with and for her awesome work that she did over the years.
This is a bad move not bring her back. It was the first time they went out and got an aviation expert to be the Aviation Commissioner and now she is leaving. Previously the Aviation Commissioner position was just a promotion from a different city position. It was always someone with little aviation experience but next in-line. That seems to be the case again. Maybe since the heavy negotiations are over this will not have a huge impact.
So the Mayor of Chicago is letting the person who negotiated new leases with the airlines, which were 30 years old and very pro- AA and UA; developed and delivered on an historic $8.7 billion agreement to modernize O’Hare; opened two new runways and the first new gates in 25 years; undertook the largest investment plan for Midway in two decades; and attracted new airlines and services to make O’Hare the only American city to offer direct flights to all six major continents. Yeah, that makes sense. Ms Evans, who refused to kiss the backsides of the City Council members, found out for herself what is is like to work in the city of Chicago. The City Council’s Black and Hispanic Caucuses had threatened to hold up the $4 billion borrowing that will raise the mountain of O’Hare debt to $13 billion to press their demand for a fair share of jobs and contracts generated by the project. Sounds like there is a Mayoral election coming soon and the Mayor needs all the votes he can get, so he had to offer up Ms Evans as a sacrificial lamb . Further proof that the city of Chicago is still a corrupt/political patronage city.
Jamie Rhee is a political hack who was once the Chief of Staff of former Mayor Daley. She has been pushed around from one department to another for the last 24 years, but somehow she is the best fit to steer the 8.7 modernization project of O'Hare...puh-lease!! No, what she is and what she will do is make sure that only "qualified" construction firms, vendors, and suppliers will be in on the modernization project. In other words, she will make sure the Aldermen's "list" of workers get hired, so that the Aldermen can hand out patronage jobs to those in their wards who do their dirty work for them at election time. Further proof that nothing has changed in the last 60 years in Chicago. One step forward, three steps back.
Thank you Ginger Evans for bringing ORD into the 21st Century. It was nice while it lasted.
AmricanShamrok wrote:This is what T5 looks like this summer in terms of gate utilization. For the afternoon peak hours, some aircraft (especially those that have long ground time at ORD) are towed to a remote stand after unloading and are brought back an hour or so before departure as has been the case for years. Other aircraft are, of course, towed over to T1 or T3 for departure. You'll note gates M6 and M14 seem underutilized - this is because they are unusable when widebody aircraft are parked at either or both of the adjoining gates. They tend not to use M14 at all.
Caveat: I do not work at ORD so this may not be 100% accurate - it is based on my own observations of gate usage by airlines at T5 and the data used is taken from a random Monday in July 2018. Arrival/departure times are rounded to the nearest :00 or :30.
yeogeo wrote:Pretty substantial increase for United on its ORD-SJO route: once daily from January 7 (previously once or twice per week).
Wonder if anyone knows the history of this route... has it ever been a daily service before with any carrier -even if seasonal?
https://www.routesonline.com/news/38/ai ... e-in-1q19/
Trk1 wrote:When the holiday period is over--any news on average wait time to get a shuttle bus from. Term 5 to term 1. at 1:00pm on a Tuesday?
chidino wrote:What happened to completion this year? First I've heard of it. How is this so difficult? What the £^%& is "substantial completion"? Are we really going to function with shuttle bus "service" for 15 months (or more)? Is it just me, or has this now reached point-'n-laugh status?
yeogeo wrote:chidino wrote:What happened to completion this year? First I've heard of it. How is this so difficult? What the £^%& is "substantial completion"? Are we really going to function with shuttle bus "service" for 15 months (or more)? Is it just me, or has this now reached point-'n-laugh status?
What surprises me is the almost total lack of information on what is essentially a public works project. It seems that there is no one in the city who fills the role of spokesman for the project and apparently no news outlet curious enough about it to actually dig deeper and present even a little peak behind the curtain. Perhaps the general public is not that interested -as opposed to what I suppose is a minority: the readers/writers here who are intensely interested.
United787 wrote:Substantial Completion is a construction term meaning essentially complete and operating. There would still be punch list stuff to complete which could take months after that. When it is completely done, it is called Final Acceptance.
Planeboy17 wrote:I’ve been a proud Chicagoan for 46 years now and this is truly embarrassing! The most annoying part is the lack of information. Not to mention the underwhelming graphics for the Terminal expansion. Has there been any publicly realeased drawings of any of the new terminals?
kngkyle wrote:Planeboy17 wrote:I’ve been a proud Chicagoan for 46 years now and this is truly embarrassing! The most annoying part is the lack of information. Not to mention the underwhelming graphics for the Terminal expansion. Has there been any publicly realeased drawings of any of the new terminals?
It hasn't been designed yet. In June the city launched an architecture competition to design the new terminal - http://www.chicagobusiness.com/article/ ... -for-ohare
I'd say we are a good while away from having any shiny renderings.
ADrum23 wrote:kngkyle wrote:Planeboy17 wrote:I’ve been a proud Chicagoan for 46 years now and this is truly embarrassing! The most annoying part is the lack of information. Not to mention the underwhelming graphics for the Terminal expansion. Has there been any publicly realeased drawings of any of the new terminals?
It hasn't been designed yet. In June the city launched an architecture competition to design the new terminal - http://www.chicagobusiness.com/article/ ... -for-ohare
I'd say we are a good while away from having any shiny renderings.
Not even the T5 expansion, which I thought was separate from the rest of the development?
kngkyle wrote:Planeboy17 wrote:I’ve been a proud Chicagoan for 46 years now and this is truly embarrassing! The most annoying part is the lack of information. Not to mention the underwhelming graphics for the Terminal expansion. Has there been any publicly realeased drawings of any of the new terminals?
It hasn't been designed yet. In June the city launched an architecture competition to design the new terminal - http://www.chicagobusiness.com/article/ ... -for-ohare
I'd say we are a good while away from having any shiny renderings.
kngkyle wrote:ADrum23 wrote:kngkyle wrote:
It hasn't been designed yet. In June the city launched an architecture competition to design the new terminal - http://www.chicagobusiness.com/article/ ... -for-ohare
I'd say we are a good while away from having any shiny renderings.
Not even the T5 expansion, which I thought was separate from the rest of the development?
Separate from the rest of the development yes, but not really a new design. It'll just be a continuation of the existing design of T5 as far as I am aware.
ADrum23 wrote:And why hasn't that begun construction yet? It seems like they could at least go ahead and get going on that so they can get DL out of T2.
kngkyle wrote:Planeboy17 wrote:I’ve been a proud Chicagoan for 46 years now and this is truly embarrassing! The most annoying part is the lack of information. Not to mention the underwhelming graphics for the Terminal expansion. Has there been any publicly realeased drawings of any of the new terminals?
It hasn't been designed yet. In June the city launched an architecture competition to design the new terminal - http://www.chicagobusiness.com/article/ ... -for-ohare
I'd say we are a good while away from having any shiny renderings.
ADrum23 wrote:kngkyle wrote:ADrum23 wrote:
Not even the T5 expansion, which I thought was separate from the rest of the development?
Separate from the rest of the development yes, but not really a new design. It'll just be a continuation of the existing design of T5 as far as I am aware.
And why hasn't that begun construction yet? It seems like they could at least go ahead and get going on that so they can get DL out of T2.
chidino wrote:ADrum23 wrote:Not even the T5 expansion, which I thought was separate from the rest of the development?
Confusingly, the T5 work will take place in two phases. The first is the already-announced 9-gate expansion, which was just the city's first "down payment" on improving and expanding int'l service, announced prior to O'Hare 21's formalization. It is just an expansion of T5 and does not involve any major reconfigurations or reassignments (other than F6, who already moved.)
But there are virtually no amenities in T5, except for the new food court (or lounge access). That reconstruction, which will bring T5 fully into being a "mixed" terminal with DL resident, will not be built until after the OGT is completed, per the terms of the plan -- right now, 2026. DL is scheduled to remain with T2 (or the new satellites after T2 demo) until after OGT is completed and T5 is worked on again.
ADrum23 wrote:yeogeo wrote:chidino wrote:What happened to completion this year? First I've heard of it. How is this so difficult? What the £^%& is "substantial completion"? Are we really going to function with shuttle bus "service" for 15 months (or more)? Is it just me, or has this now reached point-'n-laugh status?
What surprises me is the almost total lack of information on what is essentially a public works project. It seems that there is no one in the city who fills the role of spokesman for the project and apparently no news outlet curious enough about it to actually dig deeper and present even a little peak behind the curtain. Perhaps the general public is not that interested -as opposed to what I suppose is a minority: the readers/writers here who are intensely interested.
And we still don't even know what exactly this ATS rehab project entails. All I have heard is they are replacing the cars and upgrading the control system; why in the heck will that take until September of 2019 to complete when they've been working on it for almost six months now? If they were physically tearing down the system (i.e, removing the existing tracks and replacing them), I could understand, but it doesn't sound like they are doing that.
And what about the actual CONRAC facility, when will that open?
This is a joke, and it is an ominous prelude of things to come when the meat of O'Hare 21 gets underway. Sad, Chicago deserves better......
piedmontf284000 wrote:Not sure about that, as DL will have to move out of Terminal 2 in order for the construction to begin, which will include demolition of E & F. As it stands now, T5 will be the first phase of the $8.5 billion upgrade at O'Hare International Airport. That will allow DL, NK and B6 to move to T5 which allow for construction on the major components of T2 and T3.
ADrum23 wrote:kngkyle wrote:ADrum23 wrote:
Not even the T5 expansion, which I thought was separate from the rest of the development?
Separate from the rest of the development yes, but not really a new design. It'll just be a continuation of the existing design of T5 as far as I am aware.
And why hasn't that begun construction yet? It seems like they could at least go ahead and get going on that so they can get DL out of T2.
chidino wrote:ADrum23 wrote:And why hasn't that begun construction yet? It seems like they could at least go ahead and get going on that so they can get DL out of T2.
Confusingly, the T5 work will take place in two phases. The first is the already-announced 9-gate expansion, which was just the city's first "down payment" on improving and expanding int'l service, announced prior to O'Hare 21's formalization. It is just an expansion of T5 and does not involve any major reconfigurations or reassignments (other than F6, who already moved.)
But there are virtually no amenities in T5, except for the new food court (or lounge access). That reconstruction, which will bring T5 fully into being a "mixed" terminal with DL resident, will not be built until after the OGT is completed, per the terms of the plan -- right now, 2026. DL is scheduled to remain with T2 (or the new satellites after T2 demo) until after OGT is completed and T5 is worked on again.
(It may make sense to move DL now and get it started, but if we think AA and UA are paying for this so that Delta has new facilities years before them, we are smoking some very reality-altering stuff. Big difference between letting LCCs do it and allowing their largest competitor to gain a foothold.)
United787 wrote:I think everyone needs to chill out a little bit. The ink on the O’Hare 21 plan has just dried. Although they have a basic master plan approved, that is far from finished architectural drawings. So you all have some patience:
1. First they need to hire the architectural teams. I am guessing the work will be divided into a couple of different teams. IMHO, T5 will one firm and the T2 etc. will be another and maybe even more. Although T5 has been “in the works” to some degree, I haven’t seen any indication they have had an architect has been working on design drawings… maybe planning. So expect another couple of weeks before they announce the teams.
2. The architectural teams will need to go through their design process. I would expect 9-15 months but hopefully they can release certain construction document packages in pieces so they can begin construction earlier.
3. And then construction starts…
To PIEDMONTF284000 (I didn’t want to quote your whole post)
Architectural firms aren’t usually decided on low bid. The City tends to have a lot more subjectivity when it comes to hiring designers, finding the right firm for the job. Rahm will want this to be special so I have high expectations here.
Have you seen the forms and background information required when bidding and contracting with the City? As a small business owner, I won’t do it anymore, too much paperwork for a small business, so much of it to eliminate corruption. Corruption happens but it isn’t easy in this City anymore. There are too many hoops to jump through and I have seen so many people goto jail. I am fairly confident that the firms hired for this work won’t be hired because of connections, contributions, bribing etc. Hired to fulfill MBE and WBE requirements, yes, but that is legal, like it or not.
The facilities east of T5 (south of Old Cargo Rd) are already gone. Not the ones north of the road but there is plenty of vacant land to start most of the construction, if they had a design.
Why such pessimism? The OMP is almost finished and that was no small feat…
That said, I agree that the lack of transparency with the City surrounding O’Hare is frustrating: The entire OMP project, as large as it was, yielded very little press releases of what actually was happening. For the new AA L stinger gates, all we got was an announcement starting construction and an announcement for the opening. Nothing in between and never a single rendering. We had no idea what it was going to look like until it was done.
In my experience, public entities in general are notoriously cautious about releasing information to the public. They never want to give more information than they need to in fear of opening the door to criticism. But Chicago is in another class when it comes to this. Neighborhood projects are better at this because they have to answer to neighborhood groups but there is no neighborhood group for ORD, there is no public entity that is watching ORD. So they give out very little. I don’t think it is generally because of nefarious reasons but more they don’t want obstacles thrown into progress. Like it or not, this is how the sausage is made in Chicago and why things get done a lot faster with less NIMBYISM that you might get in California and the East Coast. Just because we aren’t privy to the details doesn’t mean that there aren’t qualified people making this all happen. They just don’t want the public’s opinion (design by committee) if they can get away with it. More information from the City comes out now through the media filing freedom of information requests than through actual City press releases.
United787 wrote:I think everyone needs to chill out a little bit...
In my experience, public entities in general are notoriously cautious about releasing information to the public. They never want to give more information than they need to in fear of opening the door to criticism. But Chicago is in another class when it comes to this.
yeogeo wrote:United787 wrote:I think everyone needs to chill out a little bit...
In my experience, public entities in general are notoriously cautious about releasing information to the public. They never want to give more information than they need to in fear of opening the door to criticism. But Chicago is in another class when it comes to this.
Good post, United787! You may need to re-post every so often during the years ahead as this project continues (and I'm including myself in the impatient group that needs the reminder).
United787 wrote:I agree, we are all anxious and excited to get this thing going... but I would argue against ORD lacking investment. Yes in terminals, but the runway reconfiguration (the OMP), has been the single largest airport project in the US since DEN and that airport opened 20 years ago. The $8 billion price tag for the OMP is almost double what DEN cost and is more comparable to the clean sheet airports like Istanbul, Mexico City, Dubai etc. but with 6 parallel runways!
ADrum23 wrote:United787 wrote:I agree, we are all anxious and excited to get this thing going... but I would argue against ORD lacking investment. Yes in terminals, but the runway reconfiguration (the OMP), has been the single largest airport project in the US since DEN and that airport opened 20 years ago. The $8 billion price tag for the OMP is almost double what DEN cost and is more comparable to the clean sheet airports like Istanbul, Mexico City, Dubai etc. but with 6 parallel runways!
I meant lacking investment in the things the general public sees, like terminals, parking garages, etc. Yes, O'Hare has had big investments in things behind the scenes, like runways and cargo ops, but passenger terminals and other passenger amenities at the airport have had virtually no investment for the better part of 25+ years, and it has cost ORD dearly. I believe the new Concourse L stinger gates and the forthcoming CONRAC/ATS rehab will be the first major improvement passengers have actually scene in over two decades.