Moderators: jsumali2, richierich, ua900, PanAm_DC10, hOMSaR

 
TC957
Posts: 3869
Joined: Wed May 23, 2012 1:12 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Tue Jun 30, 2020 4:38 pm

Opus99 wrote:
Any idea when BA's 777 LN 1667 is entering FAL

It's probably at the " parts arriving " stage now, and given the current production rate, enter FAL towards the end of July.
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Jul 02, 2020 8:03 pm

747classic wrote:
Arion640 wrote:
Can someone advise where the BA 777’s are at?


BA may even consider not to accept these four operational leased 777-300ER aircraft from Novus , after a comparison between the amount of penalty payment and the actual lease rate over X years.
In the upcoming years there will probably a reduced demand for long range passenger traffic.

The order, announced during the Farnborough Airshow in 2018, represents Novus’ first direct order with a manufacturer at a list price of $1.4bn. Scheduled for delivery in 2020, the four long-range wide-body twin-engine aircraft will be leased to a leading European carrier once operational.
See : https://www.novus.aero/news/182


There may be some 2+2=5 speculation going on here as the first 3x BA frames don't show any reference to Novus. They show Saqr Aviation Holding Limited, leased to British Airways. The 4th frame has a different tab number range which suggests it's a separate unrelated order although I've yet to make deeper enquiries about it.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Jul 02, 2020 9:36 pm

RobK wrote:
747classic wrote:
Arion640 wrote:
Can someone advise where the BA 777’s are at?


BA may even consider not to accept these four operational leased 777-300ER aircraft from Novus , after a comparison between the amount of penalty payment and the actual lease rate over X years.
In the upcoming years there will probably a reduced demand for long range passenger traffic.

The order, announced during the Farnborough Airshow in 2018, represents Novus’ first direct order with a manufacturer at a list price of $1.4bn. Scheduled for delivery in 2020, the four long-range wide-body twin-engine aircraft will be leased to a leading European carrier once operational.
See : https://www.novus.aero/news/182


There may be some 2+2=5 speculation going on here as the first 3x BA frames don't show any reference to Novus. They show Saqr Aviation Holding Limited, leased to British Airways. The 4th frame has a different tab number range which suggests it's a separate unrelated order although I've yet to make deeper enquiries about it.

Was able to get access to Cirium fleet analyser and they are all under Novus. MUFG provided financing for all 4 for novus to purchase outright and then lease onto BA.

Arrival for G-STBM to G-STBP is September to December. One a month

I’ve also confirmed with BA insiders that they’re very much expecting the frames.
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Jul 08, 2020 7:33 am

DHL 777F D-AALP made her first (B1) flight with callsign BOE273 at July 7th 2020, see : https://flightaware.com/live/flight/BOE ... /KPAE/KPAE

For pictures see Matt Cawby's Paine Field blog of July 7th, see : http://kpae.blogspot.com/2020/07/paine- ... uly-7.html

Detailed picture : http://www.paineairport.com/kpae18487u.htm

Aircraft data : L/N 1661 C/N 66086 B777F D-AALP DHL/AEROLOGIC (WF273)
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
User avatar
qf789
Moderator
Topic Author
Posts: 11162
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Jul 11, 2020 11:11 am

China Southern 77W B-20E7 test flight at PAE (6 Jul)

Image

https://twitter.com/KPAE_Spotter/status ... 58497?s=20
Forum Moderator
 
trex8
Posts: 5596
Joined: Sat Nov 02, 2002 9:04 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sun Jul 12, 2020 9:20 pm

CIs 6 777s due 2020-2023. they have already paid 241 million as of Sept 2019
.
https://www.china-airlines.com/tw/en/Im ... -38445.pdf

In July and August 2019, the Company signed a contract with the Boeing Company to purchase three
B777F aircraft and exercised the option to purchase three B777F aircraft. The total list price of the six
aircraft is US$2,320,315 thousand, and the expected delivery period is from 2020 to 2023. As of
September 30, 2019, the list price has been paid in the amount of US$241,650 thousand (recognized as
prepayments for aircraft).
 
TC957
Posts: 3869
Joined: Wed May 23, 2012 1:12 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Jul 15, 2020 7:20 am

Are the l/n for the two KLM 77W's known yet ?
 
User avatar
qf789
Moderator
Topic Author
Posts: 11162
Joined: Thu Feb 05, 2015 3:42 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Jul 18, 2020 7:05 am

DHL/Aerologic 777F D-AALP arriving at PAE after a test flight (15 Jul)

Image

https://twitter.com/JenSchuld/status/12 ... 96128?s=20
Forum Moderator
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Jul 24, 2020 4:49 am

The first 777F for AirBridgeCargo at the Everett Flight Line.

VQ-BAO, KPAE, July 23th 2020

Image

Original uploaded by Matt Cawby at twitter, see : https://twitter.com/mattcawby/status/12 ... 6652932096

Aircraft data (only one source, not confirmed) : L/N 1663 C/N 66625 B777F VQ-BAO AirBridgeCargo (WF288)
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
TC957
Posts: 3869
Joined: Wed May 23, 2012 1:12 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Jul 24, 2020 11:59 am

Interesting....does this mean that Boeing and Volga-Dnepr have kissed and made up over their recent on-off-on order spat ? Is l/n 1660 going to ABC as well or have Boeing sold that frame to China Cargo like 1657 ? Possible the V-D 748F order can be resurrected as well ?
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Jul 24, 2020 1:17 pm

TC957 wrote:
Interesting....does this mean that Boeing and Volga-Dnepr have kissed and made up over their recent on-off-on order spat ? Is l/n 1660 going to ABC as well or have Boeing sold that frame to China Cargo like 1657 ? Possible the V-D 748F order can be resurrected as well ?


Both L/N 1657, N50281 (ex. VQ-BAB) and L/N 1660, N50217 (ex. VQ-BAK) have been sold to China Cargo Airlines, owned by China Eastern Airlines (51%)
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Jul 24, 2020 1:24 pm

https://docs.google.com/spreadsheets/d/ ... edit#gid=5

1667 (G-STBM) Now in FAL

User TC957 KLM does not have a LN Number yet. But delivery is scheduled for November and December 2020 for the two frames on order.
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Jul 24, 2020 9:31 pm

The Volga pictured above was sold/transferred to DAE 4 Ireland Ltd and leased to Volga-Dnepr UK for operation by Cargologicair. Can confirm the other 2 orders have both been sold to China Cargo as noted above.
 
danipawa
Posts: 488
Joined: Sat Oct 01, 2016 1:18 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Jul 25, 2020 12:54 am

so Volga going to take just 1 unit ?
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sun Jul 26, 2020 9:06 am

danipawa wrote:
so Volga going to take just 1 unit ?


Volga Dnepr UK Ltd has 6 more 777F aircraft on order according the latest Boeing Order and Delivery listing (up to and incl. June 2020)
The original order, placed at December 21th 2018, was for nine (9) aircraft.
After the controverse about the delivery of three 777F (and 1 748F), two 777F delivery positions have been sold to China Cargo Airlines and one 777F has been transferred to DAE (see RobK's reply above) and will be operated by Cargologicair , a Volga Dnepr sub-division.
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
User avatar
Stitch
Posts: 27308
Joined: Wed Jul 06, 2005 4:26 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sun Jul 26, 2020 1:51 pm

747classic wrote:
After the controverse about the delivery of three 777F (and 1 748F), two 777F delivery positions have been sold to China Cargo Airlines and one 777F has been transferred to DAE (see RobK's reply above) and will be operated by Cargologicair , a Volga Dnepr sub-division.


The interesting part is that Volga-Dnepr entered into a sale and lease-back agreement with DAE for three 777F which were intended to be operated by AirBridgeCargo in August 2019 (part of their 2018 Farnborough Bonanza with Boeing). I have always presumed that two of those planned DAE frames were the two subsequently rejected and re-sold to China Cargo, but it will be interesting to see if Volga-Dnepr actually takes any more 777F and if they do, if at least two are then sold to and leased-back from DAE.
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Jul 29, 2020 5:22 am

A7-BFW, the next 777F for Qatar Airways, was ferried back from Portland (KPDX) after paint, callsign BOE283, see : https://flightaware.com/live/flight/BOE ... /KPDX/KPAE



A7-BFW, KPAE, July 28th 2020



Image



Original uploaded by Jennifer Schuld at twitter, see : https://twitter.com/JenSchuld/status/12 ... 6012049409



Aircraft data : L/N 1662 C/N 66341? B777F N5017V A7-BFW QATAR AIRWAYS (WF283)
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
User avatar
scbriml
Posts: 19288
Joined: Wed Jul 02, 2003 10:37 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Jul 29, 2020 12:25 pm

Boeing announces that 777/777X production will reduce to two per month in 2021.

https://boeing.mediaroom.com/news-relea ... tem=130713
Time flies like an arrow. Fruit flies like a banana!
There are 10 types of people in the World - those that understand binary and those that don't.
 
User avatar
SQ22
Moderator
Posts: 1922
Joined: Sat Feb 25, 2012 9:29 am

Re: Boeing 777 Production/Delivery Thread - 2020

Mon Aug 03, 2020 5:18 pm

According to FlightGlobal one 77W delivery of AF-KLM Group will be postponed to 2021.

Four more 787s are still scheduled for delivery in 2020, although two others – due in 2021 and 2022 – are delayed to 2024, while a Boeing 777 for 2020 is being deferred to next year.


So one of the two remaining 77W for KL will not be delivered in 2020.

Air France-KLM aims to minimise fleet deferrals to keep competitiveness on track
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 5:33 am

Some 777 firing order updates :

L/N 1660 C/N 66624 B777F N50217 Volga-Dnepr (VQ-BAK) ntu, China Cargo Airlines ? (WF287)
L/N 1661 C/N 66086 B777F D-AALP DHL/AEROLOGIC (WF273)
L/N 1662 C/N 66341 B777F N5017V A7-BFW QATAR AIRWAYS (WF283)
L/N 1663 C/N 66625 B777F VQ-BAO DAE Lsd AirBridgeCargo (WF288)
L/N 1664 C/N 66870 B777F N5022E A7-BFX QATAR AIRWAYS (WF284)
L/N 1665 C/N 66256 B777F N5513X N846FD FEDERAL EXPRESS (WF244)
L/N 1666 C/N 66911 B777F D-ALFH LUFTHANSA CARGO (WF165)
L/N 1667 C/N xxxxx B-777-300ER G-STBM BRITISH AIRWAYS
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
MBASS
Posts: 21
Joined: Sat Feb 10, 2018 5:14 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 10:19 am

Opus99 wrote:
https://docs.google.com/spreadsheets/d/1xPZP2NmigprVBd5dklYcFOGraAn4C8Z4W0z2TPD-eD0/edit#gid=5

1667 (G-STBM) Now in FAL

User TC957 KLM does not have a LN Number yet. But delivery is scheduled for November and December 2020 for the two frames on order.


Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 10:33 am

MBASS wrote:
Opus99 wrote:
https://docs.google.com/spreadsheets/d/1xPZP2NmigprVBd5dklYcFOGraAn4C8Z4W0z2TPD-eD0/edit#gid=5

1667 (G-STBM) Now in FAL

User TC957 KLM does not have a LN Number yet. But delivery is scheduled for November and December 2020 for the two frames on order.


Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?

Thats most likely the reason why
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 12:33 pm

Some (not yet listed) first (B1) flights :

- L/N 1664, Qatar Cargo 777F------ : callsign BOE284, dd. July 31th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
Detailed picture from Matt Cawby's Paine Field blog of July 31th, see : http://www.paineairport.com/kpae18546v.htm
- L/N 1665, Fedex 777F---------------: callsign BOE244, dd.August 13th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
Detailed picture from Matt Cawby's Paine Field blog of August 13th : http://www.paineairport.com/kpae18579n.htm
- L/N 1666, Lufthansa Cargo 777F : callsign BOE165, dd. August 09th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
No picture yet !
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 12:35 pm

747classic wrote:
Some (not yet listed) first (B1) flights :

- L/N 1664, Qatar Cargo 777F------ : callsign BOE284, dd. July 31th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
Detailed picture from Matt Cawby's Paine Field blog of July 31th, see : http://www.paineairport.com/kpae18546v.htm
- L/N 1665, Fedex 777F---------------: callsign BOE244, dd.August 13th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
Detailed picture from Matt Cawby's Paine Field blog of August 13th : http://www.paineairport.com/kpae18579n.htm
- L/N 1666, Lufthansa Cargo 777F : callsign BOE165, dd. August 09th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
No picture yet !

1667 B1 flight should be the next one then! Haven't seen a brand new BA 77w in a while
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Aug 14, 2020 4:16 pm

Opus99 wrote:
1667 B1 flight should be the next one then! Haven't seen a brand new BA 77w in a while


You can satisfy your needs here :) :
https://www.airliners.net/search?aircra ... 431&page=1
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Aug 19, 2020 5:56 pm

747classic wrote:
Some (not yet listed) first (B1) flights :

- L/N 1666, Lufthansa Cargo 777F : callsign BOE165, dd. August 09th, see : https://flightaware.com/live/flight/BOE ... /KPAE/KMWH
No picture yet !


L/N 1666, D-ALFH, KPAE, August 18th 2020

Image

Orginal uploaded by Jennifer Schuld at twitter, see : https://twitter.com/JenSchuld/status/12 ... 9266745344
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Aug 20, 2020 4:11 pm

G-STBM should be rolling out any day now/ may have already rolled out. Does anyone have any information?
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Tue Sep 01, 2020 12:48 am

LH cargo D-ALFH has been delivered
 
BobLoblah
Posts: 11
Joined: Mon Nov 04, 2019 3:05 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 2:49 pm

Anyone know what is going on with 777 production? line 1666 has been delivered for a few days now, so line 1667 and several others should have rolled out of the factory. Yet we have seen nothing.
 
User avatar
Stitch
Posts: 27308
Joined: Wed Jul 06, 2005 4:26 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 3:42 pm

BobLoblah wrote:
Anyone know what is going on with 777 production? line 1666 has been delivered for a few days now, so line 1667 and several others should have rolled out of the factory. Yet we have seen nothing.


Production is being reduced to 3 per month and it's also possible the next batch of customers have signaled to Boeing they would prefer a later delivery than originally contracted (even if only a matter of weeks).
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 4:26 pm

Stitch wrote:
BobLoblah wrote:
Anyone know what is going on with 777 production? line 1666 has been delivered for a few days now, so line 1667 and several others should have rolled out of the factory. Yet we have seen nothing.


Production is being reduced to 3 per month and it's also possible the next batch of customers have signaled to Boeing they would prefer a later delivery than originally contracted (even if only a matter of weeks).

Besides all stated above : Most 777F customers want a "on time" delivery.
Customers for 777-300ER aircraft are trying to delay delivery as long as possible.
Boeing is already changing 777 production slots to satisfy their customers and to reduce the number of production slots for the 777-9.
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
BobLoblah
Posts: 11
Joined: Mon Nov 04, 2019 3:05 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 4:38 pm

Thank you both. I have been hoping to at least see pictures of the next few at this point, but it looks like Boeing has done a good job of keeping them under cover.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 4:52 pm

Stitch wrote:
BobLoblah wrote:
Anyone know what is going on with 777 production? line 1666 has been delivered for a few days now, so line 1667 and several others should have rolled out of the factory. Yet we have seen nothing.


Production is being reduced to 3 per month and it's also possible the next batch of customers have signaled to Boeing they would prefer a later delivery than originally contracted (even if only a matter of weeks).

1667 the BA 300ER is operating from October 1st in BA’s updated schedule. Of course subject to change but it is expected this month...which I guess is also subject to change.

Also to add for 1667. Financing has been provided to the lessor Novus Aviation so as I understand it there’s no up front capital acquisition cost for BA
 
inkjet7
Posts: 189
Joined: Sat Jan 19, 2019 9:32 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 6:14 pm

MBASS wrote:

Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?


KLM has parked only five planes, all A330-200's (PH-AOA/B/C/M/N).
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Sat Sep 05, 2020 6:49 pm

inkjet7 wrote:
MBASS wrote:

Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?


KLM has parked only five planes, all A330-200's (PH-AOA/B/C/M/N).


The second KLM 777-300ER has already been postponed to 2021, see reply 170 in this thread.
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 10, 2020 7:21 am

G-STBM Has rolled out.

Confirmation here:

http://www.paineairport.com/kpae18630b.htm

Parked next to the 747 in the background at the fuel dock at Everett. You can see the Union Jack pre-existing spray paint on the tail
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 7:28 am

https://www.jetphotos.com/photo/9844403

G-STBM in its full glory. I believe what we saw at the fuel dock was G-STBN
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 7:56 am

Opus99 wrote:
https://www.jetphotos.com/photo/9844403

G-STBM in its full glory. I believe what we saw at the fuel dock was G-STBN


Location BFI ?? So, the first flight must have been performed already ?
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
Opus99
Posts: 1155
Joined: Thu May 30, 2019 10:51 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 9:04 am

747classic wrote:
Opus99 wrote:
https://www.jetphotos.com/photo/9844403

G-STBM in its full glory. I believe what we saw at the fuel dock was G-STBN


Location BFI ?? So, the first flight must have been performed already ?

Oh i didn’t even notice that. I think we would’ve noticed if it had performed a first flight. I think that might be an error. Because I’ve seen some BFI pano shots recently and I didn’t notice any BA tails there
 
machbullet
Posts: 26
Joined: Sun Aug 30, 2020 11:36 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 4:31 pm

MBASS wrote:
Opus99 wrote:
https://docs.google.com/spreadsheets/d/1xPZP2NmigprVBd5dklYcFOGraAn4C8Z4W0z2TPD-eD0/edit#gid=5

1667 (G-STBM) Now in FAL

User TC957 KLM does not have a LN Number yet. But delivery is scheduled for November and December 2020 for the two frames on order.


Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?


I would be surprised if they didn't do this.
 
jbs2886
Posts: 2483
Joined: Wed Apr 01, 2015 9:07 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 5:57 pm

machbullet wrote:
MBASS wrote:
Opus99 wrote:
https://docs.google.com/spreadsheets/d/1xPZP2NmigprVBd5dklYcFOGraAn4C8Z4W0z2TPD-eD0/edit#gid=5

1667 (G-STBM) Now in FAL

User TC957 KLM does not have a LN Number yet. But delivery is scheduled for November and December 2020 for the two frames on order.


Could KLM have postponed delivery of the 2 last 77W due to the lower passenger number, and planes they already have that are parked?


I would be surprised if they didn't do this.


In the most recent AF-KLM announcement, the second is delayed until 2021.
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Fri Sep 11, 2020 7:11 pm

747classic wrote:
Opus99 wrote:
https://www.jetphotos.com/photo/9844403

G-STBM in its full glory. I believe what we saw at the fuel dock was G-STBN


Location BFI ?? So, the first flight must have been performed already ?


Location error in the blurb. That's a PAE stall, as you would expect.
 
User avatar
747classic
Posts: 3340
Joined: Sat Aug 15, 2009 9:13 am

Re: Boeing 777 Production/Delivery Thread - 2020

Wed Sep 23, 2020 5:29 am

G-STBM made her first (B1) flight with callsign BOE861 towards Moses Lake at september 22th 2020, see : https://flightaware.com/live/flight/GST ... /KPAE/KMWH

G-STBM, KPAE, Sept 22th
Image

Original uploaded by Royal Scott King at twitter, see : https://twitter.com/royalscottking/stat ... 8812819456

Aircraft data : L/N 1667 C/N 66582 B-777-300ER G-STBM, Saqr Aviation Holding Limited, lsd. BRITISH AIRWAYS (WE861)
Operating a twin over the ocean, you're always one engine failure from a total emergency.
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 6:07 pm

Dynasty freighter, 2x KLMs, 3x Thais and Turmenistan LR all coming in quick succession after the 4th BA.
 
airsmiles
Posts: 126
Joined: Mon Sep 14, 2009 9:14 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 6:49 pm

RobK wrote:
Dynasty freighter, 2x KLMs, 3x Thais and Turmenistan LR all coming in quick succession after the 4th BA.


Are they coming out in that order or will the BA aircraft be manufactured in between the rest?
 
Jet-lagged
Posts: 915
Joined: Mon Mar 04, 2002 11:58 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 6:50 pm

In that BA777 photo above, the back landing gear looks like a four axle arrangement. :)
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 7:02 pm

airsmiles wrote:
RobK wrote:
Dynasty freighter, 2x KLMs, 3x Thais and Turmenistan LR all coming in quick succession after the 4th BA.


Are they coming out in that order or will the BA aircraft be manufactured in between the rest?


No, they are all after the last BA but with the odd gap here and there.
 
The777Man
Posts: 6128
Joined: Sun Jul 04, 1999 4:54 am

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 7:09 pm

RobK wrote:
Dynasty freighter, 2x KLMs, 3x Thais and Turmenistan LR all coming in quick succession after the 4th BA.


3x Thai ? As in TG ?

The777Man
Boeing 777s flown: UA, TG, KE, BA, CX, NH, JD, JL, CZ, SQ, EK, NG, CO, AF, SV, KU, DL, AA, MH, OZ, CA, MS, SU, LY, RG, PE, AZ, KL, VN, PK, EY, NZ, AM, BR, AC, DT, UU, OS, AI, 9W, KQ, QR, VA, JJ, ET, TK, PR, BG, T5, CI, MU and LX.. Further to fly.. LH 777
 
User avatar
RobK
Posts: 3724
Joined: Mon Sep 06, 2004 1:43 pm

Re: Boeing 777 Production/Delivery Thread - 2020

Thu Sep 24, 2020 7:14 pm

The777Man wrote:
RobK wrote:
Dynasty freighter, 2x KLMs, 3x Thais and Turmenistan LR all coming in quick succession after the 4th BA.


3x Thai ? As in TG ?

The777Man


Yep, the BOC order. I think on the balance of probabilities the remaining 8 will be cancelled. Not seeing anything for them. Mind you, given TGs financial state I expect they probably want to cancel too, but too late now and tied up with BOC.

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos