UAEflyer wrote:I wonder how is the floor plan look like from inside
The first frame will have a interim cabin, because LH-Technik has only 3 month time for outfitting. ( EIS june 2020 ) The second frame will arrive in 2022 with the final cabin installed. Then the first frame gets the final cabin and join the fleet with the last frame in 2023.