Quoting AA767400 (Reply 1): Terminal 9 has projected to open it's customs and immigration facility in March, while opening the remaining gates in Terminal 9 around April-May. When this happens terminal 8 will be torn down and the new Terminal 9 will become Terminal 8. |
Quoting NYC777 (Reply 2): I was hopeing that they would build out into the area now occupied by T8 and make it look like a real terminal building instead of something that's half done. |
Quoting PanAm330 (Reply 4): Wasn't that the original plan, back before it was downsized? Is the 'new' plan to leave the new terminal as-is when the current T8 is demolished? |
Quoting NYC777 (Reply 2): I was hopeing that they would build out into the area now occupied by T8 and make it look like a real terminal building instead of something that's half done. |
Quoting Jsnww81 (Reply 7): If I remember correctly, the next phase (opening in March-April) includes the customs hall, about 10-12 more gates for international flights and an expansion of the ticket hall. Am I right? |
Quoting Jsnww81 (Reply 7): Beyond that they still have the ability to add another 10-15 mainline gates (when/if they build the concourse out across the old T8 site). Does the plan still call for someday adding the small wings for American Eagle, or have those been completely eliminated from the terminal design? |
Quoting STT757 (Reply 13): Complete the AA terminal to full 1999 specifications, moving BA , IB, Qantas, Icelandair, ANA, CX, AC to the completed AA terminal. |
Quoting STT757 (Reply 13): Complete the AA terminal to full 1999 specifications, moving BA , IB, Qantas, Icelandair, ANA, CX, AC to the completed AA terminal. |
Quoting STT757 (Reply 13): Replace T-2, T-3 with a single multi-tenent 15-20 gate Domestic terminal, UAL, CO, WN, US, ect. |
Quoting Jsnww81 (Reply 17): Another question about the new AA terminal... do both concourses (B and C) have international capability? I was always under the impression that Concourse C (the 'island' concourse) was for domestic flights only. Is there a second sterile tunnel leading from this concourse to the customs hall? |
Quoting Jsnww81 (Reply 17): do both concourses (B and C) have international capability? |
Quoting Qqflyboy (Reply 19): Yes, both B and C have international capability. The outside gates of concourse C (even numbered) are domestic only, but the inside gates (odd numbered, except for 31 and 33) are international capable. For those who have been to the midfield concourse (C), when you walk through the tunnel there are hallways on both sides. One of them is used to exit passengers directly to baggage claim while the other, yet unused hallway, will carry international arrivals to customs and immigration. As mentioned earlier, AA may begin international arrivals in T9 sometime next month. The customs and immigration facility should be completed in the next couple of weeks, and depending on when AA and FIS work out a transition date, international flights should begin there soon. Again, it will come at the expense of moving some domestic flights back to T8 until the rest of T9 is finished (July 13 or 14). |
Quoting Nycfly75 (Reply 23): I believe Intl flights to London, Paris, Rome and Brussels ( i may be missing 1 or 2) go out of T9. |
Quoting Puck (Reply 22): Compare that to the original plan: |