Quoting lesfalls (Thread starter): |
Quoting 1337Delta764 (Reply 4): |
Quoting HKG212 (Reply 11): That said, the new/renovated terminals were mostly designed and built under tight budgets, with all sorts of compromises, and are not aging well. Nothing in JFK (or in the US for that matter) comes even close to new-generation terminals like LHR T5 in terms of quality. |
Quoting CPL22586 (Reply 10): The Port Authority is also in the process of reconstructing runway 4L-22R. They are currently in the process of installing new high speed taxiways. They are also widening the runway from 150-200 feet to comply with the needs of group VI aircraft. Concrete will replace the existing asphalt. Construction of new taxiway exits leading to the central terminal area, new taxiway access points to the north end of the runway, and other taxiway modifications. Replacing and upgrading communications/navigational aid and electrical systems. Construction of 728 feet of runway pavement on the north side of the runway to maintain departure length. |
Quoting CPL22586 (Reply 10): Delta is also in the process of constructing phase 2 of their T4 project. |
Quoting norm1153 (Reply 12): I think SFO is pretty nice. A comfortable stroll through the terminals, while waiting for a flight. Tasteful exhibits, reasonable cleanliness. |
Quoting CPL22586 (Reply 10): he Port Authority is also in the process of reconstructing runway 4L-22R. They are currently in the process of installing new high speed taxiways. They are also widening the runway from 150-200 feet to comply with the needs of group VI aircraft. Concrete will replace the existing asphalt. Construction of new taxiway exits leading to the central terminal area, new taxiway access points to the north end of the runway, and other taxiway modifications. Replacing and upgrading communications/navigational aid and electrical systems. Construction of 728 feet of runway pavement on the north side of the runway to maintain departure length. |
Quoting TWA772LR (Reply 13): But PANYNJ should think about a land reclamation project for another 13/31 runway allowing for 3 parallel approaches at the same time and takeoffs. Those additions would make JFK a beast of an airport and a very good connecting airport. |
Quoting corinthians (Reply 17): I thought that was postponed because of a lawsuit from the residents in that area. And Gov. Cuomo wanted more "studies" done to placate the residents of South Queens. |
Quoting jfk777 (Reply 14): But PANYNJ should think about a land reclamation project for another 13/31 runway allowing for 3 parallel approaches at the same time and takeoffs. |
Quoting TWA772LR (Reply 13): PANYNJ should think about a land reclamation project for another 13/31 runway allowing for 3 parallel approaches at the same time and takeoffs. |
Quoting brilondon (Reply 18): I am not sure you can expand JFK or reclaim any more land as it is in the middle of a bird sanctuary. Correct me if I am wrong. |
Quoting brilondon (Reply 18): I am not sure you can expand JFK or reclaim any more land as it is in the middle of a bird sanctuary. Correct me if I am wrong. |
Quoting CPL22586 (Reply 19): It would be great to have 3 parallel approaches but with all the surrounding homes and Jamaica Bay just dont see it happening. |
Quoting CPL22586 (Reply 19): it is currently under construction. The Northern 1171 feet of 4L-22R are torn up and they actually have a onsite concrete plant. |
Quoting TWA772LR (Reply 13): But PANYNJ should think about a land reclamation project for another 13/31 runway allowing for 3 parallel approaches at the same time and takeoffs. |
Quoting WA707atMSP (Reply 23): In the late 1960s, there were plans to fill in Jamaica Bay, with another 13 / 31 located at Rockaway Beach, and a new terminal complex between the new runway and the north shore of the bay. This proposal, along with a plan to build a supertanker terminal in Sandy Hook, New Jersey (at what's now the Sandy Hook unit of Gateway National Recreation Area)... were all cancelled for environmental reasons - and these projects' cancellation is considered to be one of the first victories of the then-new environmental movement. |
Quoting gaystudpilot (Reply 24): And... left the NYC area with a nice nude beach, Gunnison, at Sandy Hook. |
Quoting WA707atMSP (Reply 23): Wow...I didn't know they started construction already. So, 4L/22R is not being used at all at the moment? How long is construction supposed to last? |