Moderators: richierich, ua900, PanAm_DC10, hOMSaR

 
lexkid12300
Topic Author
Posts: 87
Joined: Thu Mar 17, 2011 10:32 pm

Delta Pilot Scheduling

Sat Jun 16, 2012 5:00 am

Hi everyone,

I went plane spotting at my local airport (PVD) tonight to watch planes land and it got me thinking about something. Since our airport is so small (relatively speaking) we only have 3 Delta flights (excluding Pinnacle, etc) to and from ATL. The schedule is:

PVD-ATL 6:00am - 8:30am with MD90
PVD-ATL 11:39am - 2:15pm with MD88
PVD-ATL 5:40pm - 8:20pm with MD88

ATL-PVD 8:27am - 10:59am with MD88
ATL-PVD 2:32pm - 4:59pm with MD88
ATL-PVD 8:30pm - 11:06pm with MD90

Usually all of these flights are operated with the MD88, but for some reason this month the evening ATL-PVD flight and the morning PVD-ATL is operated with an MD90. So, the MD90 lands at PVD around 11pm and takes off the following morning at 6am.

So my question is this:

Do the same pilots that take the 8:30-11:06pm flight from ATL-PVD fly the MD90 back to ATL the following morning at 6:00am? By the time they make it off of the plane, and get into a hotel, it doesn't leave much time to get back to the airport the following morning! And tonight the night flight was late! The MD90 arrived here at PVD at 11:45pm.

I would assume for similar flights at other airports, the crews that land the MD90 at night would take a flight the following day in the afternoon, but there are no MD90 flights out of PVD except for the 6am flight.

How do you guys think it works here at PVD? Are the pilots that landed here in PVD at 11:45pm going to have to fly the MD90 back to ATL at 6am? That's NOT enough sleep! If not, who will be flying the MD90 out in the am? Did Delta fly a crew here this afternoon or something? And if so, the crew that got the MD90 here tonight, do they have to wait until the following, following, day to fly the MD90 out? Or will they be shuttled somewhere else?

Thanks for any input!
 
atlamt
Posts: 256
Joined: Thu Sep 13, 2001 12:15 am

RE: Delta Pilot Scheduling

Sat Jun 16, 2012 7:12 pm

At DL the MD88 and MD90's are flown by the same crews. So one crew could bring an 88 in and fly out on a 90 the next day.
 
flymia
Posts: 7141
Joined: Thu Jun 14, 2001 6:33 am

RE: Delta Pilot Scheduling

Sat Jun 16, 2012 8:35 pm

The Md-88 and 90 will have the same pilots. Very few difference in the planes, it's the same type rating. So the pilots who came in at 5pm the evening before. My question is how the rest of the flights would go? What flight does either the 11pm arrival pilots fly or the 2pm pilots fly.
 
lexkid12300
Topic Author
Posts: 87
Joined: Thu Mar 17, 2011 10:32 pm

RE: Delta Pilot Scheduling

Sun Jun 17, 2012 12:40 am

Ah that makes sense!! Another question; are the pilots who fly the MD88/90 rated on any other A/C for Delta? Maybe the DC9? I know the instrumentation for the DC9 is a LOT different than on the MD88/90... And when Delta gets the 717, do you think the MD88/90 pilots will be able to get certified on the 717?
 
Dalmd88
Posts: 3361
Joined: Fri Jul 28, 2000 3:19 am

RE: Delta Pilot Scheduling

Sun Jun 17, 2012 1:18 am

They can be rated on every plane in the fleet. Once you get a rating it is yours. They only hold a bid spot on one type at a time. The DC9 and the MD88/90 are different bid lines. The 717 will most likely be another bid line.
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Sun Jun 17, 2012 4:30 am

Little thing in this industry called dead-heading  

But each rotation may be different. Tomorrow's flights for example (ATL-PVD-ATL)

DL 2225 ATL-PVD 0827 - 1059
DL 2225 PVD-ATL 1139 - 1415
DL 1112 ATL-PVD 1432 - 1659
DL 1112 PVD-ATL 1740 - 2020
DL 772 ATL-PVD 2030 - 2306

Now, looking at the routing you would think the flight deck crew would do all the turns but that's not always the case. On a recent flight of mine ATL-RDU I got into RDU after 3pm and the flight deck crew was done for the day. The crew doing the turn to take the a/c back to ATL in only 40 minutes was at the gate and they were just starting their day so it really depends. Then, you may have a DTW based crew doing one of the legs so they may dead-head on one of the DCI flights from DTW and take the a/c down. Then there's the possibility that the crew doing the early AM flight the next day would deadhead on say DL 1112 then overnight and do DL 1263 the next morning. Every day (or every other day in this case) there may be a different scenario as to how the flights will be staffed. It all comes down to being very efficient with your resources (cockpit and cabin crew).
 
Woodreau
Posts: 2482
Joined: Mon Sep 24, 2001 6:44 am

RE: Delta Pilot Scheduling

Sun Jun 17, 2012 5:07 am

And one more possibility, called a CDO - continuous duty overnight, or stand-up overnights or whatever the local vernacular term it is at your particular airline.

The crew that flies the last MD-90 flight into PVD also flies to first flight out. - I doubt Delta does this, but there are some airlines that schedule in this manner.

Usually a hotel room is provided for the crew to stay for the precious few hours - it is not a legal rest period and the crew is considered to be on duty the entire time in PVD. Typically the schedule might be: the crew duties on for the flight to the outstation, flies to the outstation, stays on duty at the outstation (catch a 3-4 hour nap), flies back to the hub, and once back at the hub the crew duties off and is done for the rest of the day.

Using your flight schedule:

Your crew would duty on in ATL at 7:45pm, fly to PVD, go to the hotel for 5 hours, fly back to ATL, and then duty off at 8:45am. For a total duty time of 13 hours, which would be legal assignment.

The schedule is legal under current FARs, whether that type of scheduling is contractually allowed, it depends on the pilot contract. Again, I doubt Delta schedules in this manner.
 
XFSUgimpLB41X
Posts: 3961
Joined: Fri Aug 25, 2000 1:18 am

RE: Delta Pilot Scheduling

Wed Jun 20, 2012 11:49 pm

Delta doesn't do CDOs. (Thank goodness!)
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Thu Jun 21, 2012 1:02 am

lexkid12300,

OK, here's how it works:

The flight crew that arrives into Providence on the first flight of the day from Atlanta at 10:59 a.m. stays with the aircraft and returns to Atlanta at 11:39 a.m. That is called a "turn," or more specifically for this particular route, a "Providence turn."

The flight crew that arrives on the second flight of the day from Atlanta at 4:59 p.m. remains overnight in Providence and works the 6:00 a.m. departure the next morning. That is called, of course, a layover. In this case, it seems as though the layover is around 11 and a half hours.

The flight crew that arrives on the last flight of the day from Atlanta at 11:06 p.m. also lays over in Providence and works the 5:40 p.m. departure to Atlanta the next day. This layover seems to be around 17 hours.

It doesn't matter in this case whether the aircraft is an MD-88 or MD-90--the qualification is the same for both aircraft and crews work both type of aircraft interchangeably.

The DC-9 is a different story. At Delta, the DC-9 is a completely different qualification, it is scheduled differently than the MD-88/MD-90 fleet and the DC-9 and MD-88/MD-90 pilots do not fly the other type of aircraft at all. Completely separate training programs.

If Delta receives Boeing 717 aircraft, that will also be a different qualification and DC-9, 717, and MD-88/MD-90 crews will not interchange aircraft.

Keep in mind there is a difference between being "type-rated" on a particular aircraft and being "qualified" on a particular aircraft. All pilots who fly the MD-88 and MD-90 have a "DC-9 type rating" on their pilot certificates, but individual companies may restrict the type of aircraft those pilots are actually qualified to fly. At Delta, the company prefers to keep the DC-9 and MD-88/MD-90 qualifications separate.

It was the same when TWA and Northwest were in business--the DC-9 pilots were not qualified to fly the MD-80s and vice versa.

e38

[Edited 2012-06-20 18:03:37]
 
lexkid12300
Topic Author
Posts: 87
Joined: Thu Mar 17, 2011 10:32 pm

RE: Delta Pilot Scheduling

Thu Jun 28, 2012 5:11 am

e38, how do you know all of that!!?? That's great information! It makes a lot of sense now. For some reason i never thought that the MD88 and 90 would be able to be flown by the same pilots, but it makes sense that they would be considering the cockpits are similar!

Another question: It appears that the pilots of the MD88 receive different pay rates than those flying the MD90, but if the same pilots fly both, how does their pay work?

See here for pay rates:
http://www.willflyforfood.com/airlin...ot-salary/127/Delta-Air-Lines.html

Would the pilots be receiving pay increases whenever they fly the MD90? From the site above it indicates the difference between the MD88 and MD90 in terms of pay is only $3 more per hour, but do pilots get better money per hour when they're flying on the MD90 vs the MD80?

Thanks again for all the info!  
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Thu Jun 28, 2012 3:25 pm

Quoting lexkid12300 (Reply 9):
Another question: It appears that the pilots of the MD88 receive different pay rates than those flying the MD90, but if the same pilots fly both, how does their pay work?

As explained by someone else to me just this week, they will simply recieve a different rate for the hours they are on the 90/88.
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Sun Jul 01, 2012 10:00 am

Chris with reference to the variation in pay rates between the MD-88 and MD-90, what you and FlyASAGuy2005 said is correct--the pilots are simply paid at the rate applicable to the type of aircraft they have flown and it is tracked by "ship number."

By the way, effective today, July 1, 2012, with the implementation of the new pilot contract at Delta, the pay rate for the MD-88 and MD-90 will be the same.

e38
 
lexkid12300
Topic Author
Posts: 87
Joined: Thu Mar 17, 2011 10:32 pm

RE: Delta Pilot Scheduling

Thu Jul 05, 2012 4:04 am

Well i guess that solves the issue of pay difference between MD88 and MD90! Do you know if the pay for DC9 pilots has increased?
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Thu Jul 05, 2012 6:36 am

Quoting lexkid12300 (Reply 12):
Well i guess that solves the issue of pay difference between MD88 and MD90! Do you know if the pay for DC9 pilots has increased?

Everyone got a rise. How much for each category I don't know.
 
HaveBlue
Posts: 2190
Joined: Fri Jan 30, 2004 3:01 pm

RE: Delta Pilot Scheduling

Thu Jul 05, 2012 7:00 am

Quoting FlyASAGuy2005 (Reply 13):
Everyone got a rise

Must be a great airline to work for then!   And a raise would be nice too!
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Fri Jul 13, 2012 8:18 pm

Quoting FlyASAGuy2005 (Reply 13), "Everyone got a rise. How much for each category I don't know."

I think you meant a raise.

Effective with the new contract (July 1, 2012), every pilot at Delta got an increase of basic salary of approximately 4.0 percent (not just the MD-88/MD-90 pilots, Chris).

However, there were many other changes to the contract--not just pay--to include compensation for vacation days, training, scope issues. These are just a few changes among many, many others.

e38
 
777ord
Posts: 681
Joined: Sat May 15, 2010 12:04 pm

RE: Delta Pilot Scheduling

Fri Jul 20, 2012 11:51 pm

Quoting lexkid12300 (Reply 3):
Ah that makes sense!! Another question; are the pilots who fly the MD88/90 rated on any other A/C for Delta? Maybe the DC9? I know the instrumentation for the DC9 is a LOT different than on the MD88/90... And when Delta gets the 717, do you think the MD88/90 pilots will be able to get certified on the 717?

Not really any different than "UA" and the 752/753/752 and 764 ops. It's all considered the same type certificate and training accordingly.

and, some airlines do still do the 'stand up over nights'. But, they have become quite hard to get done since most of those crews time out in the middle of the morning. Not much use to turning them. Them being reserves that is.
 
deltal1011man
Posts: 5399
Joined: Mon Sep 19, 2005 9:17 am

RE: Delta Pilot Scheduling

Mon Jul 23, 2012 11:52 am

Quoting lexkid12300 (Reply 3):

Maybe this will add.

Delta pilot category
744
777-both ER and LR
330-both 200 and 300
765-767-400ER
7ER-757/767 757-200,200ER(or ETOPS for non-Delta folk)300 767-300/300ER international and domestic
767-757-200,200ER(or ETOPS for non-Delta folk)300 767-300/300ER Domestic and some international flying. IIRC its south to the equator but I'm not 100% on that.
73N- 737-700/800/900ER*
320- A319/A320
M89- MD88 and MD90 flying
DC9- DC9-30/40/50. Only 50s are in the fleet though.
717

*900ER will have a higher pay rate than the 700/800.
Also Delta is slowly phasing out the 767 cat. I am fairly sure ATL is the only base left with them. Nearly every AE they draw it down a little.

Ok so with that covered, here are the bases
ATL:
777
330
765
7ER
767
73N
320
M89
DC9

NYC:
765
7ER
73N
320
M89

DTW:
744
777
330
7ER
320
DC9

MSP:
7ER
320
M89

CVG:
7ER(I think)
M89

SLC:
7ER
73N
320

LAX:
7ER
73N

SEA:
330
7ER

Note. The first 717 base(s) will be ATL and/or DTW. also very likely that DTW ends up with a 73N bases soon vs later.

Ok I think I got everything. may have missed something. (note SLC had a M89 base, I think its gone not sure. Also not sure if NYC 777 is gone or not. It has closed and re-opend at least 2 times.)
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Tue Jul 24, 2012 3:14 am

DeltaL1011man, the information your provided in your reply (Reply 17) is all correct with one small correction:

CVG base is 73N and M88, not 7ER and M88.

(The MD-88 and MD-90 category is officially coded M88 at Delta Air Lines).

Also, you are correct, the SLC base does not have the M88 category anymore; the flying time associated with SLC M88 was transferred to MSP (at the same time the 320 category opened in SLC) and the 777 category is only based in ATL and DTW--not NYC anymore as you stated.

e38
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Tue Jul 24, 2012 3:42 am

Quoting e38 (Reply 18):

CVG base is 73N and M88, not 7ER and M88.

Does the crew deadhead from out of base or are they rotated through CDG?
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Wed Jul 25, 2012 2:33 am

Quoting FlyASAGuy2005 (Reply 19), "Does the crew deadhead from out of base or are they rotated through CDG?"

Andrew, normally deadhead to CVG from out of base, and the trip is typically rotated among crews from the other 7ER bases. During July and August, the trip is being flown by ATL, LAX, and NYC based crews.

The trips vary between approximately five days (one roundtrip CVG-CDG) to eleven days (three roundtrips CVG-CDG).

So a typical trip might be:

Day 1: deadhead LAX, ATL, or LGA to CVG
Day 2: CVG to CDG
Day 4: CDG to CVG
Day 5: deadhead CVG back to base.

e38
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Wed Jul 25, 2012 5:23 am

Quoting e38 (Reply 20):

Ahh, that makes perfect sense. Thanks! I'm guessing the PIT-CDG flight is handled the same way.
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Wed Jul 25, 2012 10:24 pm

Quoting FlyASAGuy2005 (Reply 21), " I'm guessing the PIT-CDG flight is handled the same way."

Andrew, exactly; and the PHL - CDG flight as well. For July, both these roundtrips (PIT-CDG-PIT and PHL-CDG-PHL) are flown by ATL based 7ER crews with deadheads to and from ATL on the first and last days of the trip.

e38
 
deltal1011man
Posts: 5399
Joined: Mon Sep 19, 2005 9:17 am

RE: Delta Pilot Scheduling

Wed Jul 25, 2012 11:57 pm

Quoting e38 (Reply 18):

Oh duh. I forgot the 73N base.

7ER closed not to long ago right? (and It seems like CVG-CDG is done a lot by LAX 7ER)
 
e38
Posts: 1046
Joined: Sun May 04, 2008 10:09 pm

RE: Delta Pilot Scheduling

Thu Jul 26, 2012 12:49 am

Quoting DeltaL1011man (Reply 23), "It seems like CVG-CDG is done a lot by LAX 7ER"

DeltaL1011man, well, not necessarily.

The trip generally rotates among all the 7ER bases.

e38
 
apodino
Posts: 4207
Joined: Mon Apr 04, 2005 2:11 am

RE: Delta Pilot Scheduling

Fri Jul 27, 2012 6:54 pm

What probably happens at Delta is they will have two crews overnighting in PVD. Based on what you have told me I would guess that the 11 am arrival is a RT meaning the crew that brings it in will fly it back to ATL. The next arrival, at about 5 pm....would be an overnighting crew, with them going to the hotel for the night and then flying the 6 am the next day. Another crew would come from the hotel to fly the plane back to ATL, and this is likely the crew that operated the late night arrival into PVD that RON's the AC there.
 
FlyASAGuy2005
Posts: 3965
Joined: Sun Sep 23, 2007 4:55 am

RE: Delta Pilot Scheduling

Sat Jul 28, 2012 6:21 am

Quoting apodino (Reply 25):
What probably happens at Delta is they will have two crews overnighting in PVD. Based on what you have told me I would guess that the 11 am arrival is a RT meaning the crew that brings it in will fly it back to ATL. The next arrival, at about 5 pm....would be an overnighting crew, with them going to the hotel for the night and then flying the 6 am the next day. Another crew would come from the hotel to fly the plane back to ATL, and this is likely the crew that operated the late night arrival into PVD that RON's the AC there.

See below

Quoting e38 (Reply 8):
OK, here's how it works:

The flight crew that arrives into Providence on the first flight of the day from Atlanta at 10:59 a.m. stays with the aircraft and returns to Atlanta at 11:39 a.m. That is called a "turn," or more specifically for this particular route, a "Providence turn."

The flight crew that arrives on the second flight of the day from Atlanta at 4:59 p.m. remains overnight in Providence and works the 6:00 a.m. departure the next morning. That is called, of course, a layover. In this case, it seems as though the layover is around 11 and a half hours.

The flight crew that arrives on the last flight of the day from Atlanta at 11:06 p.m. also lays over in Providence and works the 5:40 p.m. departure to Atlanta the next day. This layover seems to be around 17 hours.

Who is online

Users browsing this forum: JoshM01, n92r03 and 31 guests

Popular Searches On Airliners.net

Top Photos of Last:   24 Hours  •  48 Hours  •  7 Days  •  30 Days  •  180 Days  •  365 Days  •  All Time

Military Aircraft Every type from fighters to helicopters from air forces around the globe

Classic Airliners Props and jets from the good old days

Flight Decks Views from inside the cockpit

Aircraft Cabins Passenger cabin shots showing seat arrangements as well as cargo aircraft interior

Cargo Aircraft Pictures of great freighter aircraft

Government Aircraft Aircraft flying government officials

Helicopters Our large helicopter section. Both military and civil versions

Blimps / Airships Everything from the Goodyear blimp to the Zeppelin

Night Photos Beautiful shots taken while the sun is below the horizon

Accidents Accident, incident and crash related photos

Air to Air Photos taken by airborne photographers of airborne aircraft

Special Paint Schemes Aircraft painted in beautiful and original liveries

Airport Overviews Airport overviews from the air or ground

Tails and Winglets Tail and Winglet closeups with beautiful airline logos